1) The leading plane

导线平面图
2) route ground plan

路线平面图
1.
ActiveX Automation is applied to improve them,and the route ground plan can be figured out by AutoCAD automatically according to the business procedure of design and management department of the highway.
分析了我国公路行业路线平面图生成方法的不足,并结合公路设计与管理部门的业务流程,应用ActiveX自动化技术对其进行了改进。
4) epipolar plane image

极线平面图
1.
Firstly,straight lines in epipolar plane image (EPI) are detected by an improved randomized Hough transform,and followed by a statistical analysis of the slopes of EPI lines.
首先采用改进的随机Hough变换提取极线平面图中的直线,并对已检测直线的斜率进行统计分析;然后根据对象在场景中所处的深度,将对应斜率的直线转换到原始图像空间中得到初始轮廓;并利用边缘生长方法缩短断开边缘的间距;最后采用边缘连接方法获得闭合的轮廓曲线。
5) planar lightwave circuit (PLC)

平面波导线路
1.
In this dissertation, the analysis and novel design of polarization-mode dispersion compensator on a silica-based planar lightwave circuit (PLC) with balanced Mach-Zehnder interferometer (MZI) configurations were presented, in order to compensate polarization-mode dispersion in optical fiber communication systems.
其次,将目前的PMD模拟器按照其对应的数学模型分成了机械旋转型、偏振控制器型和平面波导线路型三种理论模型。
6) projection on meridian

子午线平面图
补充资料:地质平面图
地质平面图
geological plan
diZhip叨爪antu地质平面图(geol帷ieal plan)根据一定标高平面上的探采工程,所揭露出的地质构造资料而编制的平面图件。它反映矿床、矿体在该水平面上的变化情况。多个平行的平面图亦可反映出矿床、矿体纵深变化情况。露天采矿地质平面图沿各平盘编制,称平盘地质平面图;地下采矿地质平面图沿各阶段或分段编制,称阶段或分段地质平面图.地质平面图是矿山生产建设、阶段或平盘开拓设计、布置探采工程、确定开采顺序、划分开采块段、综合编图和综合地质研究的依据。用水平断面法计算储量时,它也是储量计算的依据。地质平面图的基本要求包括:(l)比例尺视井区大小和地质构造的复杂程度而异,一般为1:200、1:500、1:1000,也可用1,2000。(2)图件内容包括坐标网格、导线点及标高、地层、岩性、岩体及岩相、岩层及岩体产状、断层、破碎带、岩体接触线、不整合线、矿体及编号、采样位置及编号、矿石品位(也可另表表示)、矿石技术品级及工业类型、围岩性变及矿化标志、平盘地质平面图的台阶现状线、露天矿(或露天采场)境界线、地表勘探工程、阶段或分段地质平面图的巷道、水平坑内钻、剖面钻孔位等的位置及编号。当作为储量计算图纸时须有储量计算块段划分、储量级别和储量计算参数及成果。(3)编图方法首先进行工程导线测量,露天采场须控制边坡顶底界线和平盘探槽的位置.地下采场须控制阶段或分段的巷道分布和轮廓;确定地质界线时以测量导线点控制,这时可以利用平盘探槽、台阶边坡或地下采场巷道的原始地质编录资料取地质界线,也可以由地质与测量配合进行仪器标测地质点,用填图方法确定地质界线;在工程之间进行地质联图,以一定花纹符号表示;经反复对比验证后清绘成图。 (张抄)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条