1) the degree of climax

递进程度
3) process progressive structure

过程递进结构
4) analysis method by four parameters(AMFP)

"四度"递进分析法
5) project progress

工程进度
1.
Under FIDIC condition of contract,the project progress control mainly includes project progress management,project delay and project extension stipulation.
在FIDIC合同条件下,工程进度的控制主要包括有关工程进度计划管理和工程延误、工程延期的规定。
2.
The paper analyses the forecast of project progress deviation based on the forecast theory of ordered series of numbers in the array system forecast to adopt the measure for reduce the influence to the project.
本文根据灰色系统预测中的数列预测理论,对工程进度偏差预测进行分析,以便及时采取措施,使对工期的影响降到最低程度。
3.
The project progress is apt to receive the restriction of various kinds of objective and human factors, and deviate from the plan.
工程进度容易受到各种客观和人为因素的制约 ,而偏离计划。
6) process schedule

进程调度
1.
the mechanism of process schedule in linux;

Linux的进程调度机制
2.
Through analyzing the schedule basis and the schedule procedure of Linux s process, this paper presents an improved algorithm for the process schedule of Linux.
通过对Linux进程调度依据和进程调度过程的分析,提出了一种改进的Linux进程调度算法。
3.
6 kernel process schedule algorithm is analyzed in depth.

6内核进程调度算法,为更好的满足Linux系统对嵌入式系统实时可靠性的要求,对现有的调度策略进行分析,指出Linux 2。