1) stopping water in bed rock section of shaft

基岩段堵水
2) fissure water in bedrocks

基岩段裂隙水
3) Water Based Water Shutoff Agents

水基堵水剂
4) bedrock section

基岩段
1.
Quick construction in bedrock section of the auxiliary shaft in Xingcun Coal Mine;

星村煤矿副井基岩段快速施工
2.
Practice on the construction from loess section to bedrock section in inclined shaft

斜井中黄土段至基岩段的施工实践
3.
This paper introduces the general situation of the construction of Baijiapo airshaft in Shaqu Coal Mine,Huajin Coking Coal Limited Company,expounds its construction scheme and equipment in the bedrock section,and illustrates the construction methods and the rapid construction measures.
介绍了华晋焦煤有限责任公司沙曲矿白家坡风井的工程概况和基岩段施工方案与施工设备,对施工方法和快速施工措施进行了阐述。
5) ponding of the cracked rocks

裂隙岩体堵水
6) brine-based water shutoff

海水基堵剂
补充资料:油井堵水
见水油比控制。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条