1) crest enters the method construction technique

顶进法施工技术
2) jacking construction method

顶进施工法
3) incremental launching construction technology

顶推施工技术
1.
Combined with practical work,from technological process,erection of consolidation platform and incremental launching platform,fabrication and installation of slide rail,field assembly of steel box beam and other aspects incremental launching construction technology of steel box beam is introduced in order to provide references for similar works.
结合工程概况,从顶推施工工艺流程、钢箱梁拼装平台及顶推平台搭设、滑道制作安装、钢箱梁现场拼装、钢梁顶推及落梁等方面介绍了主桥钢箱梁的顶推施工技术,以供类似工程参考借鉴。
4) the pipe jacking construction technology

顶管施工技术
1.
As a modern laying pipe jacking technics, the pipe jacking construction technology has much advantage.
顶管施工技术作为一种现代化的管道敷设施工方法,具有很多优点。
5) jacking construction

顶进施工
1.
The application of jacking construction technique in existing railway construction;

顶进施工技术在既有铁路施工中的应用
2.
Generalization of the jacking construction line reinforcing of haven-built railways;

铁路既有线顶进施工线路加固总结
3.
Discussion of the jacking construction of oblique crossing frame bridge and suggestions;

斜交框构顶进施工的探讨与建议
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条