1) black start of power plant
电厂黑起动
2) black starting-up of power network
电网黑起动
3) black start station
黑起动电站
4) black start
黑起动
1.
The power system restoration plan after all back out,also called black start,is an important problem which ensure the power system securely.
电力系统全停后的恢复计划即黑起动 ,是保证现代电力系统安全运行的重要课题。
2.
The system restoration is also called black start.
全停后的恢复通俗地可称为黑起动。
5) Heimifeng power plant
黑麋峰电厂
1.
The power flow characteristics and stable level of Hunan power grid after Heimifeng power plant put into operation were analyzed and the positive and negative influence of its operation on safety and stability of power grid were studied.
分析了黑麋峰电厂投运后,湖南电网的外送潮流特点及稳定水平,在此基础上研究了其对电网安全稳定运行的有利方面及不利一面,针对其对电网安全稳定运行可能会带来的问题,制定了相关应对措施,为运行好黑麋峰电厂,确保电网的安全稳定运行打下基础。
6) starting switch factory
起动开关厂
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。