1)  attachment point
					
	
					
				
				
	
					
				挂连点
			
					2)  three-point hitch linkage
					
	
					
				
				
	
					
				三点挂接[悬挂]连杆机构
			
					3)  coupling
					[英]['kʌplɪŋ]  [美]['kʌplɪŋ]
					
	
					
				
				
	
					
				连挂
				1.
					Simulated Technique of Cuts coupling and Anti-Running  at the Tail of Hump in the Marshalling Yards;
						
						编组场钩车连挂与编尾防溜模拟技术
					2.
					Based on the non-linear system and in the light of the characteristics of piecewise linearization of the bumper performance curve in the calculation of train couplings,the calculation formulas are re-deduced by use of the basic principles of Newmark-β method.
						
						基于非线性系统,针对列车连挂计算中缓冲器特性曲线分段线性化的特点,利用Newmark-β方法的基本原理重新推导计算公式,改进了传统的Newmark-β方法,改善了算法的稳定性,减小了计算误差,使之适用于列车连挂的计算。
					
					5)  coupling impact
					
	
					
				
				
	
					
				连挂冲击
			
					6)  coupling speed
					
	
					
				
				
	
					
				连挂速度
				1.
					Therefore, the coupling speed of Metro train shall be set slower than 4km/h.
					
					
						
						
					
						应用计算仿真的方法,分析研究地铁列车在不同连挂速度下缓冲器容量与冲击加速度和车钩力之间的关系。
					补充资料:闭式单点、双点压力机
		
  | |||||||
主要参数内容  | 国际先进 | 国内先进 | 国内一般 | 国内落后 | 评定方法及说明 | ||
(一)加工精度  | 参照GB10924-89、GB10933-89、JB5200-91 | ||||||
1、滑块下平面对工作台上平面的平行度(mm)  | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.02+0.10/100×滑块下平面的被测长度  | |||||||
2、滑块行程对工作台上平面的垂直度  | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.05+0.02/100×滑块行程长度  | |||||||
(二)结构性能  | |||||||
1、离合器、制动器接通率,当滑块行程次数≤16次/分时为70%,≤25次/分时为60%,≤45次/分时为50%  | 大于规定值10% | 大于规定值 | 达到规定值 | 达不到规定值 | |||
2、液压超负荷保险装置、微调装置、吨位指示器  | 全部具有 | 全部具有 | 部分具有 | 没有 | |||
(三)噪声dB(A)  | |||||||
1、公称力≤400kN  | ≤85 | ≤87 | ≤88 | >88 | |||
2、公称力>400kN  | ≤87 | ≤88 | ≤90 | >90 | |||
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
	参考词条