1) time loading test
时间-负载试验
2) long time load test
长时间负载实验
3) load-test
负载试验
1.
This paper introduces briefly two ways of diesel locomotive load-test :water-resistance load-test and dry resistance load-test,and compares their advantages and disadvantages,It also describes the current situation and development of diesel locomotive load-test.
简要介绍内燃机车负载试验的两种方式:水阻负载试验和干阻负载试验,比较了二者各自的优缺点,描述了机车负载试验的现状及发展。
4) load test
负载试验
1.
Method of load continuous regulation by PLC in dry-load test;
干阻负载试验中PLC实现负载连续调节的方法
2.
This paper introduces the contents of overall test of inverter and the method for controlling and connecting the units\'back-to-back test,and expounds the application effect of back-to-back test of inverter units in overall load test.
介绍了变频器整机检验的内容和机组对拖的控制连接方式,论述了变频器机组对拖在整机负载试验中的应用效果。
5) trial load
试验负载
6) time load
时间负载
1.
And the method of calculating time load of the scheduler is given based on the task model.
在雷达任务模型中将每一类驻留请求合并为一种任务,这样可以为调度处理提供最大的灵活性,同时基于此任务模型分析了调度器的时间负载。
补充资料:出血时间试验
出血时间试验
bleeding time test
将指端或耳垂刺破后,从血液自然流出到自然停止所需的时间,常用Duke氏法,正常值1~4分钟。血小板减少及功能、结构异常时出血时间延长,此外毛细血管功能或结构异常时出血时间亦延长。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条