1) needle-felting; felt-needling process

针刺制毡法
2) Needle felt looms

针刺制毡机
3) pinfelt

针刺毡
1.
at-20 ℃~55℃,Acme-break intensity and puncture resistance increase with the temperature going up,and Acme-break intensity increase with a layer area-density of UHMWPE pinfelt rising.
通过对UHMWPE(超高分子量聚乙烯)纤维针刺毡单层样品的撕破强力、顶破强力和多层样品的抗刺穿能力测试,结果表明:随着单层UHHWPE纤维针刺毡织物面密度的增加,试样的顶破强力增大;在本文研究范围内,随着试样预处理温度升高,顶破强力和抗刺穿能力皆增强;但是试样的撕破强力则无这种变化趋势。
4) needle felt

针刺毡
1.
Activation and adsorption of ACF needle felt;

混纺活性炭纤维针刺毡的活化与吸附关系
2.
Flame retardant property of jute/polypropylene fiber needle felt;

黄麻/聚丙烯针刺毡的阻燃性能
3.
Activation and adsorption capacity of ACF needle felt;

混纺活性炭纤维针刺毡的生产与预氧化
5) needled felt

针刺毡
1.
Frictional and wear behaviors of C/C composites from a needled felt at different braking speeds;
不同制动速度下针刺毡炭/炭复合材料的摩擦磨损行为
2.
Frictional and wear behaviors of the C/C composite from a needled felt were investigated at different pressures and speeds by simulating the aircraft braking with pairs of circle samples.
用模拟刹车制动的摩擦试验机,研究探讨了一种针刺毡结构C/C复合材料在不同制动压力和制动速度下的摩擦磨损性能,并用扫描电子显微镜对摩擦表面进行了观察和分析。
6) fiber needling felt

针刺成毡
补充资料:JIT准时制生产(及时制生产)
JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条