1) idle path

空载行程
2) no load operation

空载运行
1.
The no load operation of Y, d11 traction substation is analysed systematically which results in the high voltage side phase A?C over compensation, phase B Less compensation; the active power circulation of phase A?C and the three phases symmetric power system and because the low voltage side phase a?c unsymmetric fixed reactive power compensation in Y, d11 traction substation are reached.
系统地分析了电气化铁路Y ,d11牵引站的空载运行。
3) to sail in ballast

空载航行
5) dead mileage

空载里程
6) loading mileage

载货行程
补充资料:空载
见“负荷③”(285页)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条