1)  schedule diagram
进度计划图
2)  the vertical schedule graph
进度计划图表
3)  schedule plan
进度计划
1.
Research of Schedule Plan and Schedule Control of Fire System of Jingshui Building;
晶水大厦消防工程项目进度计划与控制研究
2.
This article expounds the making of schedule plan and schedule control according to the practical application of P3 in Zhuzhou Navigation Lock project,so as to reveal to the engineering administrators the application method of P3 and main ideas and methods of engineering project administration reflected by P3.
结合P3在株洲船闸工程项目的应用,对进度计划的编制及进度控制作简要叙述,旨在使各级工程管理人员了解如何应用P3,了解P3所反映的工程项目管理的主要思想及方法。
3.
Project network technique is presently a frequently-used method to make project schedule plan.
目前,工程项目进度计划的编制多采用网络计划方法。
4)  schedule [英]['ʃedju:l]  [美]['skɛdʒul]
进度计划
1.
we are aiming at establishing a more practical and visible schedule control chart based on Bar Chart and CPM.
通过对影响工程进度的约束事件的分析,在横道图和关键线路网络图(CPM)的基础上,力图建立一种施工现场实用直观的进度计划控制图技术。
2.
How to schedule highway engineering while considering influence of random factors was discussed,then,a new project planning technique considering effect of random factors was presented which classified those random factors and constructed different models to deal with different kinds of random factors using computer simulation technology and program evaluation and review technique(PERT).
对在编制公路工程进度计划时如何考虑气候等随机因素的影响进行了研究,提出了考虑气候等随机因素影响的公路工程动态网络计划方法。
3.
Case study shows that the present method may help to obtain reliable work schedule for projects and the earliest time for each node.
针对给定施工进度风险水平的施工进度计划编制问题,采用当量概率和蒙特卡罗仿真技术,给出了基于一定施工进度风险水平的施工进度计划的编制步骤;运用Delphi7。
5)  progress schedule
进度计划
1.
The working out and adjustment of construction progress schedule are researched in accordance with the construction management practice of Dongping hydroproject.
结合洞坪工程建设管理的实际,就施工过程中的进度计划制定及调整做了分析与研究。
2.
In th e construction and management of the project, we should pay great attention to t he progress control and should formulate detailed progress schedule, effectively trace the construction process, timely analyzes the construction progress and p roperly make some adjustment,in order to ensure the smooth completion of Jinhe H ydropower Project in schedule.
在电站建设管理中,要高度重视进度的管理,应做到制定详细的进度计划;进行有效的过程跟踪;及时分析进度并调整等,以确保金河电站按计划进度顺利完成。
6)  scheduling [英]['skedʒul]  [美]['skɛdʒʊl]
进度计划
1.
Multicriteria Optimal Model for Scheduling Using Genetic Algorithms;
利用遗传算法实现进度计划的多目标优化
补充资料:放矿计划图表


放矿计划图表
chart of ore drawing

fong伙旧ng]lhuo tub旧。放矿计划图表(ehart of ore drawing)在崩落岩石覆盖下放矿时,根据选定的放矿制度和尽量提高矿块出矿强度等要求编制规定各漏斗放矿先后、时间和数量的计划图表。放矿计划图表应表明在什么时间、从哪些漏斗分别放出多少矿石和岩石。 采用依次放矿的放矿制度时,可以根据物理模拟放矿结果编制放矿计划图表。因为在这种放矿制度中,从各个漏斗放矿的次序已经确定;在某一时间某一漏斗的一份放出中的矿石量和岩石量是多少,也能通过物理模拟放矿加以确定但用随机模拟放矿去编制该放矿计划图表、则更为准确。对用削高峰的放矿制度时,漏斗间放矿的顺序取决于高峰落在哪个漏斗上面物理模拟放矿过程中无法知道高峰落在哪个漏斗上面,靠估算则精度又太低;简易的办法是进行随机模拟放矿在随机模拟放矿中,按不断削高峰原则确定的各漏斗放矿的次序仍然是依次的,矿块的出矿强度太低为了提高矿块的出矿强度,应尽量增多同时放矿的漏斗.但应满足下列要求:(l)在同一条电耙巷道中不同时从两个以上的漏斗放矿,以免无法记录从每个漏斗放出量。(2)对于同时放矿的两个以上的漏斗,个漏斗放矿不应导致另外漏斗轴线上的崩落矿岩接触点下移.以保证崩落矿岩接触面尽量按要求下降。满足这两项要求的方法是,轮到从某漏斗放矿时,就把从该漏斗放矿的日期排在已排过的最后一天,然后看是否满足这两项要求。如果能满足,则往前挪一天;如果不能满足,则把这个日期排在最后一天的后面这样编制的放矿计划图表,就是放完该矿块的通盘计划图表。执行这种放矿计划图表时,还应逐日累计从每个漏斗放出的矿岩量,通过多退少补,使实际的累计量靠拢计划值 (苏宏志)