1) modulus of subsurface drainage
排渍模数
2) Draining waterlogging model in cultivated soil layers
耕作层排渍模型
3) drainage modulus
排涝模数
1.
Study on drainage modulus calculation method of diked area;
圩区排涝模数计算方法研究
2.
Based on the rainfall-runoff relationship in small watershed with different lower-lying condition,and by means of Nash s instantaneous unit curve method,the drainage modulus has been analyzed and the calculation method of drainage discharge has been presented in the study.
本研究以不同下垫面条件下小流域降雨入渗产流规律为基础,应用Nash单位线汇流方法进行排涝模数计算的研究,提出了目前条件下排涝模数计算的解决方案,即以经验排涝模数乘以折减系数0。
3.
The calculation method of drainage modulus in agricultural diked area is inapplicable in urban diked area.
农业圩区原有的排涝模数计算方法已不适用于城镇圩区。
4) drainage modulus
排水模数
1.
Study on drainage modulus calculated with short-term stopping storage method in waterlogging region;
短期停蓄法计算涝区排水模数的研究
2.
The calculation process of farmland drainage modulus was proposed on the basic of salt equilibrium.
通过试验数据制定了干旱盐碱区的地下水临界深度标准,并提出了从盐均衡角度来计算农田排水模数。
3.
This paper described different methods of calculating drainage modulus, gave the process of calculating drainage modulus of waterlogged farmland with short-term storage suspension method, and proved the method with a case.
本文简要介绍了涝区排水模数不同计算方法,提出了应用短期停蓄法计算涝区排水模数过程,并用实例加以论证。
5) flood drainage modulus
排涝模数
1.
The designed flood drainage modulus was determined by calculating the flow hydrograph,and the mathematical model for calculation of designed flood drainage modulus was analyzed based on condition of low-lying region in Taihu Lake basin.
为此以设计流量过程调蓄计算方法确定设计排涝模数,并以太湖流域圩区为实例,分析了圩区设计排涝模数计算的数学模型,得出设计排涝模数与水面率之间的二次抛物线关系,其系数与圩区面积有很好的响应关系。
2.
In order to determine the flood drainage modulus in dike regions of river networks in South Jiangsu,check the drainage capacity and provide the bases for drainage planning,the modeling method by using BP neural network is put forward on the basis of the conventional adjusting and storing computation.
为了确定苏南河网圩区的排涝模数,对现状排涝能力进行校核,同时为除涝工程规划提供依据,在分析了常规调蓄计算的基础上,提出了利用BP神经网络建模的方法,并结合苏南水网圩区实例进行了探索,建立了排涝模数确定的BP神经网络模型,给出了模拟预测结果。
3.
This article takes a low-lying region in shanghai as background,aims at the compartmentalization problem of time interval in the actual calculation,studies the impact of different time interval on the designed flood drainage modulus,elicits a conclusion that the designed flood drainage modulus increases along with the increased time interval within a certain scope,and analyses.
以上海某圩区为背景,针对改进平湖法在实际计算中时间步长的划分问题,研究了不同的时间步长对设计排涝模数的影响,得出在一定的范围内,随着时间步长的增大,排涝模数也增大的结论,并详细分析了产生这些结果的原因。
6) rainwater pump
排渍泵站
补充资料:湿渍渍
1.湿漉漉。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条