1)  engineering sand-mining
					
	
					
				
				
	
					
				工程性采砂
				1.
					Technical study and discussion on monitoring and measurement of mined quantity for engineering sand-mining in Yangtze River
						
						长江工程性采砂监测与方量检测技术研究与探讨
					
					2)  engineering type of sand excavation
					
	
					
				
				
	
					
				工程类采砂
			
					3)  sand excavation from river bed
					
	
					
				
				
	
					
				人工采砂
				1.
					Boluo Station and Huiyang Station, in combination with the real situation of changes in hydrologic characteristics due to sand excavation from river bed near Boluo Station, and in accordance with relevant codes, a thorough discussion was carried out to the computation method of the design lowest navigable stage in Boluo Station.
						
						在对广东省东江的基本站博罗站、惠阳站设计最低通航水位计算结果深入分析基础上,结合博罗站附近人工采砂活动对其水文特性改变的实际情况,依据规范,对博罗站的设计最低通航水位的计算方法进行深入的探讨。
					
					4)  Engineering Properties of Aeolian Sand
					
	
					
				
				
	
					
				风成砂工程特性
			
					5)  the stability of mining engineer
					
	
					
				
				
	
					
				采矿工程稳定性
			
					6)  Sandy soil disaster defending project
					
	
					
				
				
	
					
				砂防工程
	补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
		坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
	参考词条