2) previous term risk control
前期风险控制
4) tenure risk
任期风险
1.
The results of these two methods are similar and complement each other,from which we can find that four factors,such as tobin s Q,age,degree and stock turnover,are affecting board chairman and CEO s tenure risk similarly because that both board chairman and CEO are sh.
从结果可以看出,董事长和总经理因为同样处于代理人的位置,所以他们的任期风险影响因素中有几个是共同的:市场业绩、年龄、学历、股权变更。
5) lead-time risk
工期风险
1.
In this paper, a lead-time risk transfer algorithm is presented, as well as the systematic analysis including risk evaluat.
但由于其具有异地分布、多利益团体等特性 ,如何有效地进行工期风险控制成为一个非常关键的问题 。
6) risk expectation
风险预期
1.
This article analyzes the illegal cases risk expectation transmission mechanism with some simple models,provides suggestive policies for cutting off the transmission channel and diminishing the effects of Internet Bank risks.
案件风险及所引致的不安全预期广泛传导,已成为我国网络银行发展的重要障碍,本文通过几个简单的模型分析案件风险及预期传导机制,并对阻断风险预期的传导、缩小风险影响提出对策建议。
补充资料:前期
1.所定日期之前;事情出现之前。 2.事前或过去的约定;预定。 3.对未来的预期﹐打算。 4.某一时期的前一阶段。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条