1)  removing the closure segment
拆除合龙段
1.
Accompanied with replacement of the closure segment in the midspan,after removing the closure segment and thus forming two half bridges,the alignment of main girder was improved by means of adjusting cable forces,which is a precedent in maintenance of existing prestressed concrete cable-strayed bridges.
与中跨合龙段置换相匹配,利用拆除合龙段后形成两半桥的时机,通过调索来改善主梁线形是国内既有PC斜拉桥维修的一个先例。
2)  closure segment
合龙段
1.
Authors researched mid-span closure segment ballasting methods for prestressed concrete continuous rigid frame bridge,aiming to expatiat the functions of ballasting and discuss the methods of basic ballasting.
针对连续刚构桥中跨合龙段配重展开研究,阐述了配重的作用,讨论了基本配重的方法。
2.
In this paper, the construction of the closure segments and system transformation for the box girders is summarized, which is expected to serve as reference to the constrction of similar works.
东海大桥是我国在建的第一座跨海大桥,其远海段非通航区域采用了70m预应力混凝土箱形连续梁,对箱梁合龙段的施工与体系转换进行了总结,供同类型工程施工时参考。
3.
On the main span and two side spans of the main bridge, there is each one closure segment, 2 m in length, and along with the closing of the spans, the Bridge has completed two time of structural system transformation.
其中跨和2个边跨各设1个长度2m的合龙段,随着边跨和中跨的合龙,结构先后完成2次体系转换。
3)  closure section
合龙段
1.
Discussion on the span closure section construction in continuous rigid-framed bridge;
浅谈连续刚构桥中跨合龙段施工
2.
The construction technology of Pengxi river cable stayed bridge side span cast-in-place section and closure section
彭溪河斜拉桥边跨现浇段及合龙段施工工艺
3.
Based on engineering practice,the paper introduces in detail the construction technique of abutment on pier top and temporary buttress,the construction technique at 0 section,the construction technology of casting concrete for cantilever and cast-in-situ concrete section for side span and the construction technology at closure section,sums up the key construction technique of conti.
结合该工程实际,对墩顶支座及临时支墩施工技术、0号段施工技术、悬臂浇筑及边跨现浇段施工工艺、合龙段施工工艺等进行了详细的介绍,总结了大桥连续刚构关键施工技术,实践证明这些施工工艺和控制技术是可行的,为以后类似工程提供了借鉴。
4)  lock of closure segments
合龙段锁定
5)  closure segment replacement
合龙段置换
6)  closure section of main pylon
主塔合龙段