说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 埋设要点
1)  burying points
埋设要点
1.
Simply analyzing the burying points,familiar failures and preventive measures about acoustic pipe of the bored pile
浅析钻孔灌注桩中声测管埋设要点、常见故障及预防措施
2)  well point pipe's dmbeding
井点管埋设
3)  burying of observation point
观测点埋设
4)  Design essentials
设计要点
1.
Taking a 600 MW set as an example,the design essentials of large and high temperature Selective Catalytic Reduction(SCR) reactors are being explained and epitomized.
介绍了600 MW机组使用的大型高温选择性还原反应器的结构设计要点,根据流体力学分析,确定了反应器进出口、导流器、喷氨装置的结构与布置,从而在整个空间范围内有效地控制烟气速度偏差和NH3/NOx摩尔比偏差,以满足脱硝反应的要求。
2.
The design essentials of the main electrical connection,protection configuration,and general layout of the bridge conne.
对110 kV变电所两线三变桥接线模式中的电气主接线、保护配置、总平面布置等方面的设计要点进行了探讨。
3.
The paper analyses the design essentials for automatic CIP system, mainly about flow and pressure of centrifugal pump, pipe diameter, effective volume of tank, control components, etc.
本文主要针对全自动CIP系统设计过程中清洗泵流量和扬程的确定、清洗管径及罐体有效容积的确定、控制元件设置等设计要点进行了较为全面的阐述,为CIP系统的规范化设计提供了参考依据。
5)  design points
设计要点
1.
On the design points of the intelligent museum
智能化博物馆的设计要点
2.
The structure and design points of hard alloy drawing combination concave die were introduced in detail and provided the reference to the similar die design.
对硬质合金拉伸凹模结构及设计要点作了详细介绍,对同类型模具设计提供了参考。
3.
Using ratch cam intermittence shut-off mechanism,keeped parts on a carrier,and shut off after punching a certain length,through the concrete example,the structure principle,working process and design points of the ratch cam intermittence shut-off mechanism were introduced.
应用棘轮凸轮间歇切断机构,将制件留在一条载体上,构成一定长度后再切断成条状,通过具体实例,从棘轮凸轮间歇切断机构结构原理、动作过程、设计要点等方面作了介绍。
6)  main points of design
设计要点
1.
This paper introduced the mechanism of stable high pressure fire water supply system and discussed the main points of design including system model and component; water supply area arrangement, equipment allocation and technical parameters determination; control mode and interlock requirement.
系统地阐述了稳高压消防给水系统的工作原理,探讨了设计要点,包括系统的形式及组成;系统供水范围划分、设备配置及技术参数确定;控制方式及联锁要求。
2.
This paper briefly expounds the main points of design for drum drive system of well logging wheeled machice.
简要论述了该石油测井车电缆滚筒传动系统的设计要点。
3.
Moreover,the thesis puts forwards some main points of design of the energy efficient building partly,combining with the experience of constructing energy efficient building in europe and the situation in our country,so as to realize the target of energy saving building in China.
主要介绍了节能建筑的概念和优点,以及近年来在我国推行节能建筑的相关法规,并结合欧洲节能建筑的经验和我国实际情况提出了节能建筑的部分设计要点,从而实现我国节能建筑的目标。
补充资料:井点降水法


井点降水法
lowering the water table by well point

  Ji叩d仰J心戊笋浏fo井点降水法(lowering the water table by we-n一point)预先将井筒穿过的含水层通过用钻孔进行疏干,然后掘进井筒的施工技术。在不稳定的含水岩层中开凿井筒时,在预定的井筒周围凿出钻孔,利用钻孔抽水或往下放水,使地下水位降落,疏干含水层。然后,在疏干区内进行井筒掘砌作业。井点降低地下水位的方法有抽水法和放水法.前者利用深井泵或潜水泵从井筒周围钻孔中抽水,使水位降低,形成疏干区。(见图)后者在井筒断面内凿出钻孔(滤水孔),使地下水经滤水孔流人下部已开凿的巷道内,再转排至地面。抓 井点降水示意图 1一井筒;2一抽水孔.3一地下原有静水位, 4一深井泵.5一抽水时静水位 钻孔抽水法是在比井筒掘进直径大4m的布孔圈径上钻3~6个直径为100~500mm的钻孔,其深度以进人不透水层中2~4m为宜。随着钻凿孔的进行在钻孔中安设好保孔管,保孔管上钻有直径为5~15mm的小孔,包扎好金属过滤网,以防止砂粒进人撼管内磨损水泵或使孔壁坍塌.钻孔抽水时,孔内的水位急剧降低,形成水位最低点.外部围岩中的水,因存在水位差而流向孔内,水位降低较大,而远离钻孔的水流阻力则增大,因此水位降低较小,从而形成降水漏斗,满足了疏干要求。 矿井降水孔的涌水量多为30~loom,/h,主要含水层的水位降低值可达几十米。当含水岩层渗透系数大于3m/d时,井点降水法较为有效。井点降水法通常不能使水位降低到含水层的最低深度处,在隔水层上部有一段井筒的水没有被疏干称为残余水柱。必要时需要采取其他措施(如板桩法)来保证该段井筒的掘砌施工。 井点降低水位可使土体密实,引起结构上的土压力增高和地面下沉,应注意防止不均匀沉降。当含水砂层厚度不大、粘土夹层不超过两层,有良好渗透性时,宜采用钻孔抽水法。 (张著超)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条