1) segmental camber
预抬量
1.
Taking Da-ning River Bridge in construction as the engineering background,the optimization analysis of cable forces and segmental cambers has been carried out during the process of arch rib segmental installment.
以在建的大宁河大桥为工程背景,开展拱肋吊装过程扣索索力和预抬量的优化分析。
2) preraised height
预抬高量
1.
Considering the second-order effect in analyzing temperature effect, the relationship between preraised height and the deformation of stay cables is obtained.
依照千斤顶斜拉扣挂悬拼架设钢管混凝土拱桥的施工工艺,采用力矩平衡原理推导出扣索索力表达式;在分析温度效应时考虑二阶效应,导出了预抬高量与扣索变形之间的关系。
3) prearranged height
预抬高值
1.
The prearranged height calculations in control points of steel arch ribs during constructing a concrete-filled steel tubular arch bridge are divided into two parts: rigid body displacement and elastic deformation.
对钢管混凝土拱桥吊装施工拱肋控制点的预抬高值分两部分进行考虑:一部分由刚体位移引起,一部分为拱肋弹性变形产生,两部分之和为实际的预抬高值。
4) uplift
[英][ʌp'lɪft] [美][ʌp'lɪft]
抬升量
1.
The control of messenger wire uplift is the key during the replacement construction of messenger wire without stretching equipment.
在更换承力索的施工中,由于无超拉设备,控制承力索的抬升量是施工的关键。
5) raising distance
抬腿量
1.
This paper gives the method calculating reaction force and raising distance of learing leys of truck crane,compiles the calculation program,and analysis reaction force and raising distance letween are influenced ly rigidity and working stalility of the truck crane, and prorides the dependabol method for designri and calculating frame of the truck crane.
本文叙述了一种计算汽车起重机支腿反力和抬腿量的方法,编制了计算机程序,分析了汽车起重机的工作稳定性以及刚度对反力和抬腿量的影响。
6) wheel vertical rise
车轮抬升量
1.
Method and criteria for evaluation of wheel derailment based on wheel vertical rise;
根据车轮抬升量评判车辆脱轨的方法与准则
补充资料:设备安装前的准备工作——设备的预装配与预调整
设备安装前的准备工作——设备的预装配与预调整![]() | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
