1.
Application of Total Station in Large Transfixion Survey Project

全站仪在大型贯通测量工程中的应用
2.
Conection of Go-through Error Causing by Position

由起始方位引起贯通测量误差的校正
3.
Technical practice of a long-distance connectingsurvey in the north ventilation shaft of Taiping coal mine
太平煤矿北风井长距离贯通测量技术实践
4.
A Study on Applying New Technology to the Western Coal Mine Holing Through Survey;

新技术在西部矿山贯通测量中的应用研究
5.
Application of Three Frames to Impact Earth Pressure Face Go-through Measurement

三架法在冲击地压工作面贯通测量中的应用
6.
Error Prediction of Inclined Shaft Anti-de-sac Run-through in Houzhuang Mine

侯庄矿水平斜井反掘贯通测量误差预计
7.
Lane Control Network Through the Measurement and Accurate Methods of Emplaced

井巷贯通测量控制网布设及精度提高方法
8.
Application of GPS Technoloy on Surveying between Tunnel Breakthrough in Two Wells

GPS技术在两井间巷道贯通测量中的应用
9.
Control Measurement and Hole-Through Survey within Parallel Adit of No. Ⅱ Line in Qinling Extra-Long Tunnel
秦岭特长隧道Ⅱ线平导洞内控制测量和贯通测量
10.
Research on the Optimization And Error Estimation of the Tunnel Transfixion Survey for High-speed Railway
高速铁路隧道贯通测量方案优化与误差预计探讨
11.
Thus, a theoretical basis is provided for the application of inserting individual control point by trilateriation to through survey.
最后以实测算例加以说明,从而为测边插点在贯通测量中的应用,提供了一定的理论依据。
12.
Reasonable Determing Measuring Error Parameters to Guarantee Tunnel Safely Go-thlough

合理确定测量误差参数保证巷道安全贯通
13.
Design and Discussion on Holing Through Error of Urban Mass Transit

城市轨道交通工程隧道施工贯通误差测量精度设计与探讨
14.
through chainage

【测】统一里程, 贯通里程
15.
Applying PDCA Circulation to Improve Shaft Excavation

应用PDCA循环,提高井巷贯通质量
16.
Variable Parameters Sequential Adjustment with Relevant Observation

具有相关观测量的可变参数序贯平差
17.
Quantified Measurement of the Discourse Coherence--A Study Based on Centering Theory

语篇连贯性的量化测量——基于向心理论的研究
18.
Determination of Additional Survey Location of the Gyrostatic Orientation Line in Traverses
贯通导线中加测陀螺定向边位置的确定