说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 硫沉降
1.
Sulfuric deposition modeling research in the east part of China──model application
我国东部地区硫沉降模拟研究──模式应用
2.
Effects of SO_2 emission reduction on sulfur deposition at coal-fired power plants in Shanxi province
山西省燃煤电厂二氧化硫减排对硫沉降的影响分析
3.
Sulfuric deposition modeling research in the east part of China──model development and performance analysis
我国东部地区硫沉降模拟研究──模式开发和性能分析
4.
Numerical Simulation of the Change of Sulphur Deposition and the Impact of Atmospheric Pollutants on Acidity of Below-cloud Rain in Fujian Province;
福建省硫沉降变化及云下污染物对雨水酸度影响的数值模拟研究
5.
Responses of the Young Eucalyptus Dunnii and Chinese Fir Plantation Litter Decomposition to Simulated Nitrogen and Sulfur Deposition
杉木及邓恩桉幼龄林凋落物分解对模拟氮硫沉降的响应
6.
The effect of the electric field on the morphology of CdS prepared by the route of chemical deposition
电场对化学沉降制备的硫化镉纳米颗粒的影响
7.
Responses of Young Eucalyptus Dunnii to Similated Nitrogen(N) and Sulphur(S) Combined Deposition
邓恩桉幼龄林对模拟氮、硫复合沉降的响应
8.
Responses of the Young Chinese Fir Plantation to Simulated Nitrogen and Sulfur Deposition
杉木幼龄林对模拟氮硫复合沉降的响应
9.
Observations of the input for atmospheric wet-deposition of nitrogen and sulfur into Agro-ecosystem
农田生态系统大气氮、硫湿沉降通量的观测研究
10.
Effect of simulated N and S combined deposition on DBH of Eucalyptus dunnii
邓恩桉胸径生长对模拟硫、氮复合沉降的响应
11.
On the Settling Performance of Red Mud from Preroasted High-Sulfur Bauxite
高硫铝土矿焙烧预处理的赤泥沉降性能
12.
However the distributing of velocity and temperature is not uniform in the mid fluid,So it is not helpful for sedimentation of matte drops.
主流区流体流速及温度场分布不均匀,不利于硫颗粒沉降。
13.
The Effect of Sulphate Reduction on Sludge Settleability in Biological Selector in Sewage Treatment System;
选择器中硫酸盐还原对污水处理系统污泥沉降性能的影响
14.
Dynamics and Critical Load of Sulfur and Nitrogen under Acid Deposition in Shaoshan Forest;
酸沉降影响下韶山森林硫与氮的动态过程及临界负荷研究
15.
Effects of simulated deposition of nitrogen and sulfur on the contents of carbon and nitrogen in young Chinese fir plantation
模拟氮、硫复合沉降对杉木幼龄林植株C和N含量的影响
16.
hindered settling
受阻沉降,干扰沉降
17.
Copper was reduced from 20 mg/l to below detectable limits by sulfide precipitation from a gold-ore extraction wastewater.
用硫化物沉淀法可将金矿抽提废水中的铜含量从20毫克/升降到可检测标准以下。
18.
" Barium sulphate,precipitated for industrial use"
GB/T2899-1996工业沉淀硫酸钡