1.
The Study of Mining Method the Water Body for South 2 Mining Area;

大平矿南二采区水体下开采方案研究
2.
fully developed secondary scheme

全面开发的二次开采方案
3.
The Design and Study of Mining Method under the Village for Aiyou Mine 106 Mining Area;

艾友矿106采区村庄下开采方案的设计研究
4.
A Plan for Mining of Complicated Gold Lode in Northern Area of Ying Gezhuang Mine

英格庄北矿区难采金矿脉开采方案研究
5.
Study on High Efficient Mining Scheme for Xiaowanggou Iron Mine to Transfer from Open-Pit into Underground Mining
小汪沟铁矿露天转地下高效开采方案研究
6.
Resolution to Corner Coal Exploitation Scheme of Aged Coal Mine

衰老矿井边角呆滞煤开采方案设计研究
7.
Schematic design of full trackless underground mining of Aigedzor copper-moly ore

艾格佐尔铜钼矿全无轨地下开采方案设计
8.
Numerical Simulation of Mining at Guanshan Kaolin Mine under Tombs

观山高岭土矿保护公墓群开采方案选择研究
9.
Mining Plan for Levels below-580 m in Huashupo Deposit in Dongguashan Copper Mine

冬瓜山花树坡矿床-580m以下中段开采方案探讨
10.
(1) having a feasibility study report on or mining plan for coal mine construction project;
(一)有煤矿建设项目可行性研究报告或者开采方案;
11.
Based on AHP, Fuzzy Mathematics and ANN Gasturbo-charged Mining Plan Optimal Model Study;

基于AHP、模糊数学和神经网络的天然气增压开采方案优选模型研究
12.
Studies on Multiple-constrained Optimal Pumping Project of Groundwater in Liu Gu River Section;
基于多约束条件下六股河地段地下水优化开采方案研究
13.
An Approach to the Determination of Hydraulic Conductivity and Optimal Schemes of Groundwater Withdrawal for the Ninghebei Wellfield in Tianjin;
天津市宁河北水源地渗透系数与最优开采方案研究
14.
Study on Optimal Pumping of Groundwater Based on GMS;

基于GMS的地下水开采优化方案研究
15.
(2) having a planned mining area, the limits of mining and a plan for comprehensive utilization of the resources;
(二)有计划开采的矿区范围、开采范围和资源综合利用方案;
16.
Study on Change of the Development Haulage System of Lanshan-yingpanshan-xujiashan Stope;

兰营徐统一采场过渡衔接开拓运输方案研究
17.
Numerical Simulation of High Ground Stress Metal Mine Mining and Supporting Scheme

高地应力金属矿山开采及支护方案的数值模拟
18.
Optimization of Schemes for Western Mining Boundary in Wulongquan Limestone Mine

乌龙泉石灰石矿西区开采境界方案优化研究