1.
pattern recognition of full face TBM boring performance

全断面隧道掘进机掘进状况分类识别研究
2.
Operation principle analysis of disc cutter on TBM

隧道掘进机盘形滚刀的工作原理分析
3.
Alteration of Control System for Power of TB880E-type TBM

TB880E型隧道掘进机控制系统电源改造
4.
Improvement of Motor Waterproof of Dust-exhaust System of TB880E-type TBM

TB880E型隧道掘进机除尘系统电机防水的改进
5.
Set up the TBM Industries for Promoting the Underground Space Development in China

建立隧道掘进机产业 促进我国地下空间开发
6.
Design of Control System for Auger-bore Microtunnelling Machine;

螺旋式微型隧道掘进机控制系统的设计
7.
Briefly talking of industrialization and development ways of tunnel boring machine;

浅议我国隧道掘进机产业化及发展方向
8.
Study of Cutter Layout Design of Full-face Rock Tunnel Boring Machine

全断面岩石隧道掘进机刀盘刀具布置方法研究
9.
Study on Mechanical Behavior of Metro Tunnel Construction by Tunnelling Machine in Weak-Broken Surrounding Rock
软弱破碎围岩地铁隧道掘进机施工力学研究
10.
Based on applicability of each type of TBM, users can select appropriate TBMs to meet their needs and geological conditions.
使用者可根据地质条件及特殊需要对隧道掘进机进行初步的选型。
11.
A Model Experiment Study on Optimal Characters of Blocks on Self-drive Tunnel Excavating Machine;
新型自行走式隧道掘进机增阻结构合理形式模型试验研究
12.
Study on Pattern Recognization of Tbm Boring Performance of Qinling Tunnel;

秦岭隧道全断面掘进机掘进状况识别分析研究
13.
Structure Analysis on Rock Tunnel Boring Machine Pipe Liner;

岩石掘进机隧道管片衬砌的结构分析
14.
coal or rock cutter and tunneling machinery ,self-propelled

截煤或截石机和隧道挖掘机械,自动推进
15.
coal or rock cutter and tunneling machinery ,not self-propelled

截煤或截石机和隧道挖掘机械,非自动推进式
16.
Theoretical Analysis of Special Section Tunnel Cutting Mechanism of Shield Machine;

盾构掘进机异形断面隧道切削机构的理论研究
17.
Mechanical Analysis for Main Frame of Railway Soft Rock Tunnel Roadheader;

铁路软岩隧道臂式掘进机主机架力学特性分析
18.
Study on the Simultaneous Lining Technology in the Long Tunnel Bored by Main Beam TBM

长大隧道敞开式掘进机施工中的同步衬砌研究