1.
On construction technique of 96-meter high-pier turnover forms of Yangjialing over large bridge
杨家岭特大桥96m高墩翻模施工技术
2.
The Turnover Model Constructive Technology of 94 m High Thin-Wall and Hollow Pier of the Yanxigou Ultra Large Bridge
烟溪沟特大桥94m薄壁空心墩翻模施工技术
3.
Verticality control of the bridge thin-wall pier by using turnover formwork
翻模法施工桥梁薄壁墩的竖直度控制
4.
Construction Process for Turning over the Formwork with Sliding Lift on 100m Pier
超百米高墩的滑升架翻转模板施工工艺
5.
Application technology of simple arch-frame turn-over form in inclined shaft lining construction
简易拱架翻板模在斜井衬砌施工中的应用技术
6.
Application of New Technology of Inverting Form for Reinforcing Slope to Concrete Facing Rockfill Dam of Upper Reservoir of Pushihe Pumped-storage Power Plant
翻模固坡技术在蒲石河面板堆石坝施工中的应用
7.
renewed technology of hard metal alloy mould
硬质合金模具翻新工艺
8.
Technological analysis and design of flanging die for fuel oil tank shell
油箱壳体成形工艺分析与翻边模设计
9.
The Mode of Translation Process from the Perspective of Information Processing Theory
信息加工理论指导下的翻译过程模式
10.
Disscussion on Bore Concrete Pile Construction of Car Dumper Shed for Caofeidian Coal Terminal
曹妃甸煤码头翻车机房灌注桩施工探讨
11.
The Methods of Raising Construction Quality on Road Bases in the Area where Road Surfaces Burst and BecomeMuddy when a thaw sets in;
提高季节性冻融翻浆地区路基施工质量的方法及技术措施
12.
Economies of scale of construction enterprises and implementation strategy;
建筑施工企业的规模经济及实施方略
13.
A Psychological Description of the Translation Process:An Introduction to and Comment on Bell s Information Processing Model of Translation;
翻译过程的认知心理描述——Bell翻译过程的信息加工模式评介
14.
Research on Key Problems and Dynamic Simulation for Top-Down Construction Technique;
逆作法施工关键技术与施工动态模拟研究
15.
Construction Technical of MSS Mobile Construction with 50m Span Continuous Box Girder
MSS移动模架施工50m跨径连续箱梁施工技术
16.
Problems Analysis of Formwork Design and Construct for Building Construction
建筑施工模板设计与施工中存在问题的分析
17.
Simulating Construction Stage and Calculating Transverse Load Distribution of Construction Frame
施工支架施工过程模拟和横向分布系数计算
18.
Equipment for Slip Construction of Curb and Development of Construction Technology
路缘石滑模施工设备及其施工技术的发展