1.
Change of re-siltation in the Yangtze Estuary deepwater channel during 1~(st) and 2~(nd) stages
长江口深水航道(一、二期工程)回淤变化
2.
Study on Morphological Evolution and Siltation in Deep Waterway Due to Channel Re-construction in the North Passage, Yangtze Estuary;
长江口深水航道河床演变与航道回淤研究
3.
Analysis on the Siltation and Erosion before and after 1st Phase Engineering of the Deep Waterways during 30 Years in the Yangtze Estuary;
长江口深水航道30年空间特征变化研究
4.
Yangtze Estuary Deepwater Channel Scientific Experiment Centre Phase I Project;
长江口深水航道科学试验中心一期工程
5.
Analysis of the Economic Benefit of Yangtze Estuary Deepwater Channel Regulation Project;
长江口深水航道治理工程的经济效益分析
6.
Improvement Project of Deep-Draft Channel of Yangtze Estuary
长江口深水航道治理工程的设计与施工
7.
Study and practice of comprehensive utilization of dredging soil of the Yangtze Estuary Deepwater Channel Engineering
长江口深水航道治理工程疏浚土综合利用
8.
Design and construction of the 1st & 2nd phase regulation projects of Yangtze Estuary Deepwater Channel
长江口深水航道治理一、二期工程的设计与施工
9.
A Discussion on the Feasibility of the Development of Both Sides of the Navigable Waters of Changjiang Mouth Deep Water Channel
长江口深水航道南北两侧可航水域开发、使用的可行性探讨
10.
The first phase of the project to improve the deepwater channel at the mouth of the Yangtze River has been completed, recording a new draught of 8.5 meters.
长江口深水航道整治一期工程已经完成,水深达到8.5米。
11.
On the relationship between maintenance condition of Yangtze Estuary deepwater channel and water & sediment transport from the valley
关于长江口深水航道维护条件与流域来水来沙关系的初步分析
12.
Formation of Bagged Sand Dike Core and Placing of Sand Cushion
长江口深水航道治理工程袋装砂堤心成型及砂被铺设施工工艺
13.
Bagged Sand Core Sloping Dike Structure and Its Design Method in Yangtze Estuary Deepwater Channel Regulation Project
长江口深水航道治理工程中袋装砂堤心斜坡堤结构设计
14.
Research of Engineering GIS and the application in the regulation of YRE;
工程地理信息系统及其在长江口深水航道治理工程中的应用
15.
Application of new type hollow-block mound breakwater in the Yangtze Estuary deepwater channel regulation project
新型空心方块斜坡堤结构在长江口深水航道治理工程中的应用
16.
Design of the Sloping-Faced North Leading Dike With Bagged-Sand Core for the Yangtze Estuary Deepwater Channel Regulation PhaseⅠProject
长江口深水航道治理工程一期工程北导堤袋装砂堤心斜坡堤的设计
17.
The design and construction of the sloping- faced north leading dike with bagged- sand core for the 1st phase of the Yangtze Estuary deepwater channel regulation project are introduced.
介绍长江口深水航道治理一期工程北导堤袋装砂堤心斜坡堤的设计与施工。
18.
Semi-circular composite dikes are one of the main structures in Yangtze Estuary Channel Regulation Project.
半圆体混合堤是长江口深水航道治理工程中堤坝主要结构型式之一。