1.
Research on the Retaining Structure for Deep Pit under Staged Excavation and Monitoring;

深基坑工程分步开挖变形监测反分析研究
2.
Analysis and Research on the Behavior of Foundation Pit Deformation with Considering Seepage and Multi-Stage Excavation;
考虑渗流影响与分步开挖的基坑变形性状分析研究
3.
The Finife Element Analyse on Foundation Excavation by Steps and Affection Factors of Pit-Retaining Structure Deformation;
基坑分步开挖及支护结构变形影响因素的有限元分析
4.
Study on the Behavior of Retaining Structures for Subway Station Pit under Staged Excavation;
分步开挖和逐级加撑的地铁车站深基坑围护结构性状研究
5.
Study on the Stability Induced by Stepped Excavations and Rheological Effect of Underground Cavern Groups in High In-Situ Stress Areas
高地应力条件下大型地下洞室群分步开挖稳定性及流变效应研究
6.
Study of rockburst prediction of separated tunnel excavated asynchronoushy

分离式隧道非同步开挖岩爆预测研究
7.
Furthermore, total energy release of surrounding rockmass obtained by LERR can be used as optimal index for optimal design of excavation schemes.
对太平驿水电站引水隧洞工程不同开挖步长下能量释放率指标的算例进行分析。
8.
Analysis of Space-time Effect for Displacement Relief of Strata Induced by Excavation Process of Shallow Embedded Tunnel;
浅埋暗挖隧道开挖引起地层变位时空效应分析
9.
Three-bench Seven-step Excavation of Lishi Tunnel

三台阶七步开挖法在离石隧道施工中的应用
10.
Three-bench Seven-step Excavation Method for Large Section Loess Tunnel

浅谈大断面黄土隧道三台阶七步开挖法
11.
Horizontal directional drilling technology has become a important part of non-excavation techniques, and has a big market in China.
非开挖中的导()技术已成为非开挖技术中不可缺少的重要组成部分。
12.
RESEARCH ON UNLOADING AND ZONATION OF ROCK MASS DAM FOUNDATION EXCAVATION-A CASE STUDY OF XIAOWAN HYDROPOWER STATION
坝基岩体开挖卸荷与分带研究——以小湾水电站坝基岩体开挖为例
13.
Nonlinear adaptive multigrid FEM for simulating multi-step excavation process was studied.
开发了模拟多步开挖过程的非线性自适应多重网格有限元方法。
14.
Analysis Underground Opening Based on D-InSAR;

基于D-InSAR技术的地下开挖空间分析
15.
Analysis of the Influence of Partition Piles during Tunneling Excavation;

隔断桩在隧道开挖过程中的作用分析
16.
Numerial Analysis of the Influence of Adjacent Pile Foundation Caused by Tunneling;

隧洞开挖对邻近桩基影响的数值分析
17.
Coupled Analysis of Stress Field and Seepage Field in Deep Foundation Pit;

基坑开挖中渗流场与应力场耦合分析
18.
The Slope of Guishan Stability Analysis and Optimization Comparison of Several Excavation Programs;
龟山滑坡体稳定分析及开挖方案优化