1.
Study on Horizontal Displacement of Bridge Pier and Abutment in Deep Silt Stratification Areas;
厚淤泥层地区桥梁墩台的水平位移研究
2.
Cantilever retaining wall design in condition of sick silt base
深厚淤泥土层条件下悬臂式挡土墙设计
3.
Research of Double-Layer Dynamic Compaction Replacement Method for Deep Soft Clay;
深层淤泥场地的双层强夯置换法研究
4.
Application of SMW Technology in Deep Foundation Pit Project with Thick Silt
SMW工法在深厚淤泥土基坑工程中的应用
5.
When the flood subsided, it left a layer of mud in the fields.
洪水过后, 地里淤积了一层泥浆。
6.
The Nile floods the field and deposits mud on them
尼罗河泛滥,在田野上淤积一层泥
7.
The nile flood the field and deposit mud on them
尼罗河泛滥, 在田野上淤积一层泥
8.
When the Nile rises it deposits a layer of mud on the land.
尼罗河涨水时在地上淤积一层泥。
9.
The Nile floods the fields and deposits mud on them.
尼罗河泛滥, 在田野上淤积一层泥.
10.
Constructionmethods of Artificial Digged-hole Pile Crossing Deep Silt Layer
人工挖孔桩穿越深淤泥层的施工方法
11.
Application of SMW method in the deep excavation support for sludge layer
SMW工法在淤泥层深基坑支护中的应用
12.
Application of waterworks silt in three residue base of municipal road
水厂淤泥在市政道路三渣层中的应用
13.
Groundwater-Head Fluctuations in Coastal Confined Two-Layer Aquifer System with Submarine Outlet-Cappping;
含有淤泥层边界的两层含水层系统的水头波动
14.
muck and mucky soil
淤泥和淤泥质土地基
15.
boots thickly encrusted with mud
带有厚厚一层泥巴的靴子
16.
Nondestructive testing of the thickness of dredging for fill in soft foundation on freeway
公路软基路段清淤换填层厚度无损检测
17.
Explosive Demolition of Pit Supporting of High Building on Muchy Clay Condition
淤泥质粘土条件下高层大厦基坑支撑爆破拆除
18.
Application of Shallow Excavation Technique in Constructing Underground Passage in the Slit Formation
淤泥质地层中地下过街通道浅埋暗挖施工技术