1.
Analysis on Wheel Tread Groove Wear of Shanghai Subway Vehicles;

上海地铁车轮踏面沟槽磨耗原因分析
2.
Transformation and Management Innovation of Network Operation in Shanghai Metro

上海地铁网络化运营转型与管理创新
3.
Test and Research about the Measures of Alleviating Rail Wear in Shanghai Metro

上海地铁曲线轨道减磨措施试验研究
4.
Analysis of Communication Transmission System in Shanghai Subway No.11 Line

上海地铁11号线通信传输系统分析
5.
Filling slurry enforcing technique in 10# line region of Shanghai subway

上海地铁10号线区间注浆加固技术
6.
Construction Technology of Shield Construction Up-crossing Built Tunnel in Shanghai Metro Line 9
上海地铁9号线盾构上穿越已建隧道施工技术
7.
Half Bottom-Up" Construction Technology at Jing Ansi Station of Shanghai Subway No. 2 Line
上海地铁二号线静安寺车站半逆筑法施工技术
8.
Top-Down Construction Technique for Excavation of Working Shaft Cover of TSM in Shanghai Subway Station
上海地铁车站盾构工作井盖挖逆作施工技术
9.
Design and Implementation of Tunnel Tilt Monitor System for Shanghai Metro;

上海地铁隧道倾斜监测系统的设计与实现
10.
The Planning Scheme on AS/RS of Spare Part for Shanghai Subway Line 4;

上海地铁六号线备件自动化立体仓库规划方案
11.
Study on the City Development in the Region around Shanghai Metro No. 1;

上海地铁1号线沿线城市发展的实证研究
12.
Horizontal Freezing Method Applied to By-pass in the Shanghai Underground Railway System;

水平冻结法在上海地铁隧道旁通道工程的应用
13.
Project Management of the Freezing Construction of Side Channel in Shanghai Metro

上海地铁旁通道冻结法施工中的项目管理
14.
Reliability analysis of rolling-stock brake system for Shanghai line1 extension 2

上海地铁车辆一号线制动系统的可靠性分析
15.
Lifetime Prediction of the Bogie Frame of Shanghai Metro Line 1 by 3D FEM

上海地铁1号线车辆转向架寿命预测数值分析
16.
Metro Vehicle for Shanghai Line 1 Expansion (6 to 8)

上海地铁1号线增能扩编(6改8)项目列车
17.
Freezing Construction Technology of Some Connecting Aisle in Shanghai Metro Line 10

上海地铁10号线某旁通道冻结法施工技术
18.
Underpinning construction scheme for Shanghai metro line 10 passing through pile foundation of bridge
上海地铁10号线穿越桥梁桩基础托换施工方案