说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 班多水电站
1.
Study of Main Slope Erosion Dynamic Processes on Project Area of Banduo Hydropower Station of Yellow River
黄河班多水电站工程区主要地类坡面侵蚀动力学过程试验研究
2.
Experimental Study of Runoff Processes on Waste Grassland in Project Area of Banduo Hydropower Station of Yellow River
黄河班多水电站工程区荒草地坡面产流过程试验研究
3.
Put into Operation for Standards and Effect of Pingban Hydropower Station Project;
平班水电站工程达标投产工作体会及成效
4.
Application Technology of Synthesis Automation Level Improvement in Nobody Stands Substation
提高无人值班变电站综合自动化水平应用技术
5.
A method for long term flow regime forcasting in a multi-storage system;
多水电站联合长期预报水情方法研究
6.
Unattended Substation and Substation Automation
无人值班变电站与变电站自动化
7.
Water Turbine Design for Hydropower Station with High Water Head in Sedimentladen River
浅析高水头多沙河流水电站水轮机的设计
8.
floating power barge
水上动力站水上发电站
9.
Major Measures and Achievements on Investment Control and Cost Reduction for Pingban Hydropower Station Project;
平班水电站工程投资控制及降低工程造价的主要措施和成效
10.
Optimization of concrete mix proportion for main work Contract B of Pingban Hydropower Station
平班水电站主体工程B标混凝土配合比优化设计
11.
Effect of dam-building on the diversity of aquatic wild vegetables
大型水电站建设对水生野菜多样性的影响
12.
Automatic control has been applied to larger and larger substations, and to many hydroelectric generating stations.
自动控制已在越来越大的变电站,以及许多水电站中得到应用。
13.
For example, even in many stations where an operator is on duty, outgoing overhead feeders are controlled by automatic resoling relays.
例如,许多变电站中,即便有人值班,架空馈电出线也由自动重合闸继电器控制。
14.
hydroelectric(power) statio
水(力发)电厂[站]
15.
Talking about the Importance of Pre-shift Meeting and Post-shift Meeting in the Safety Work of Substation
班前会及班后会在变电站安全工作中的重要性
16.
It be important that we build more hydroelectric power station .
我们建立更多的水力发电站,这是重要的。
17.
It is important that we build more hydroelectric power stations.
我们建立更多的水力发电站,这是重要的
18.
Construction features introduction of the Danube R. cascade hydropower station of Austria
奥地利多瑙河梯级水电站建设特色介绍