说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡引水工程
1.
Major engineering geological problems of the Qinling-Dabashan segment of the Three Gorges Water Diversion Project,China
三峡引水工程秦巴段的主要工程地质问题
2.
SURFACE GEOHAZARDS AT QINLING-DABA MOUNTAIN AND IMPACT ON THREE GORGES WATER DIVERSION PROJECT
三峡引水工程秦巴段主要地质灾害及其工程影响
3.
Study on Geo-Hazards in Tunneling of Deep-Buried Long Tunnels at Qinling-Dabashan Orogen of the Three Gorges Reservoir Water Diversion Project;
三峡引水工程秦巴段深埋长隧洞开挖地质灾害研究
4.
Assessment of Regional Crustal Stability of the Three Gorges Reservoir Water-Diversion Project in the Qinling-Dabashan Region
三峡水库引水工程(方案)秦巴段地壳稳定性评价研究
5.
Analysis of the Causes of Axial Cracks in Right-bank of the Three Gorges Hydropower Station;
三峡工程右岸地下厂房引水洞衬砌混凝土轴向裂缝成因分析
6.
Three Gorges project introduces the first foreign capital
三峡工程引进第一笔外资
7.
The Three Gorges project on the Yangtze River has recently introduced the first foreign capital.
长江三峡工程近日引进第一笔外资。
8.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
9.
Applications should be forwarded through the Yangtze Valley Authority.
申请书应通过三峡水库工程处转交。
10.
Analysis on regulation role of TGP in "07.7" flood of the Yangtze River
三峡工程对“07.7”洪水调度的作用分析
11.
Model study and prototype application of diversion outlet design for Three Gorges project
三峡工程导流底孔水力学研究与运用
12.
Construction of Three Gorges project and the scientific developing idea on hydroelectric development
三峡工程建设与“四个一”水电开发理念
13.
On Harmoniousness of the Irrigation Works and the Relationship between Human Beings and the Earth--Take the Three Gorges Project s as Example;
水利工程与人地关系协调论——以三峡工程为例
14.
Numerical Analysis and Computation on Unsteady flow in Three Gorges Project’s Lock Upper Approach Channel
三峡工程上游引航道非恒定流数值分析与计算
15.
Practice on the Third Phase Construction and Management of Three Gorges Project
长江三峡水利枢纽三期工程建设管理实践
16.
Quality Management for the Third Phase Construction of Three Gorges Project
长江三峡水利枢纽三期工程质量管理简介
17.
Study on the Stability of Loess High Slopes in Baojixia Water Division Project;
宝鸡峡引水工程黄土高边坡稳定分析研究
18.
Changes of sediment deposition and erosion at Chongqing reach in backwater area of Three Gorges Project after reservoir adjusting of the upstream in the Yangtze River
水沙调节后三峡工程变动回水区泥沙冲淤变化