1.
Both Gezhouba Project and Three-gorges dam are built in Yichang.
葛洲坝工程和三峡大坝都处在宜昌。
2.
China Gezhouba Construction Group Corp.
中国葛洲坝水利水电工程集团公司
3.
Experimental Studies of Sediment Problems of Gezhouba Project on the Changjiang River
长江葛洲坝工程泥沙问题的试验研究
4.
Gezhouba dam is one of the largest sluice gates on a inside river in the world.
葛洲坝是世界上最大的内河船闸之一。
5.
Measurement and Analysis of Harmonic Wave about Gezhouba 500kV DC Converter Station;
葛洲坝500kV直流换流站谐波测试与分析
6.
Methodology Study and Practices of Optimal Maintenance for Gezhouba Hydro Power Plant;
葛洲坝电厂最优维护方法研究与实践
7.
Effects of Three Gorges and Gezhouba reservoirs on river water temperature regimes
三峡-葛洲坝梯级水库水温影响研究
8.
Joint Dispatch of Three Gorges-Gezhouba Cascade Reservoirs
三峡—葛洲坝梯级枢纽联合调度运用
9.
Realization of Primary Frequency Regulation for Generator Units in Gezhouba Hydropower Plant
葛洲坝电厂机组一次调频功能的实现
10.
Technical innovations of Gezhouba Group in construction of hydropower engineering
葛洲坝集团在水电施工中的技术创新
11.
Twice careful decision-making by Premier Zhou on Gezhouba Project
周恩来对葛洲坝工程的两次慎重决策
12.
Analysis of Energy Loss and Economic Operation for Main Transformer in Gezhouba Power Plant
葛洲坝电厂主变变损和经济运行分析
13.
A Study on the Resistance Against Abrasion for the Sluice Buildings of Gezhouba Project
葛洲坝工程泄水建筑物抗冲耐磨试验研究
14.
Analysis on River Bed Evolution of Gezhouba Reservoir Since the Starting of Three Gorges Project
三峡工程动工来葛洲坝水库河床演变分析
15.
Analysis of the Test for Reactive Power Control of Geshang HVDC Project
葛洲坝——上海直流输电无功功率控制试验分析
16.
Packing Problem Research of Navigation Co-scheduling System for the Three Gorges Gezhouba Dam;
三峡—葛洲坝联合调度系统闸室编排研究
17.
United Dispatching Model and Arithmetic about Joint Sailing between Three-Gorges Dam and Gezhou Dam;
三峡—葛洲坝通航联合调度模型和算法的研究
18.
Design and Implementation of Navigation Scheduling Information System for Three-Gorge and Gezhou-Dam;
三峡—葛洲坝通航调度信息系统的设计与实现