说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大坝泄洪
1.
Three-Dimensional Numerical Simulation on Flood Field of Riverbed Hydropower Station
河床式电站大坝泄洪流场的三维数值模拟
2.
Concrete construction management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程混凝土施工管理
3.
Safety management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程安全管理
4.
Control of explosion in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程爆破施工控制
5.
Management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程管理综述
6.
They are used for connecting the sluice of the Three-gorge Dam and the gantry or disconnecting them.
该液压系统为三峡大坝泄洪闸实现与门机联接或脱开的系统。
7.
Design optimization and removal of the cofferdam in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程围堰设计优化及围堰拆除的设计与施工
8.
A Study on Stress Influence of the Large Orifice on the Masonry Arch Dam;
大尺寸泄洪孔对浆砌石拱坝坝体应力影响研究
9.
Study on Indexes System of Risk Analyis of Discharge Structures and Flood Discharge Calculation Based on Concrete Dam;
基于混凝土大坝的泄洪建筑物风险指标体系及泄洪风险研究
10.
Numerical Simulation and Experiment Study on Flood Discharge and Energy Dissipation of High Dam with Large Discharge
高坝大流量泄洪消能数值模拟及实验研究
11.
Experiment Research and Numerical Simulation on Flow Field of Discharge from Surface-Bottom Outlet on Low Waterhead and Big Flux;
低水头大流量厂坝联合泄洪消能流场的研究
12.
Flood water is discharged through the sluice on the Three Gorges Dam on June 19, 2007.
2007年6月19日随着三峡大坝的泄洪,滞留了多天的洪水倾泻而下。
13.
Study on the Static Characteristics of the High Arch Dam Body and the Vibration Induced by Discharge Flow;
高拱坝坝身静力特性及泄洪振动研究
14.
Shape Study on Large-discharge Flood-releasing Energy Dissipator for Crest Spillway of Medium and Small-sized Arch Dam
中小型拱坝表孔大流量泄洪消能建筑物体形研究
15.
According to presentations, the second phase project of the Three Gorges Project mainly includes bids such as the flood discharge dam, the factory protection dam and the factory buildings, etc.
据介绍,三峡工程二期工程主要包括泄洪大坝、厂房大坝及厂房等标段。
16.
Analysis on Forced Behavior of High Arch Dam s Outlet Bearing Structure;
高拱坝泄洪孔支承结构工作性态分析
17.
Study on Changheba Hydropower Station Flood Discharging Works Layout
长河坝水电站泄洪建筑物的布置研究
18.
Optimization for Layout of Flood-release Structures and Energy-dissipators for High Arch Dams;
高拱坝坝身泄洪与消能建筑物的优化布置