1.
Examination of trailers is being implemented to cover all trailers by March 1, 1998.
此外,分期实施的拖架检验计划到一九九八年三月一日时,将扩展至包括所有拖架。
2.
Belt conveyor, Stretcher and Hospital beds belong to our portfolio.For more information please call us.
提供皮带运输机、输送带、台、拖架、支座及其它产品。
3.
Annual examination was also extended to cover all trailers from March 1, 1998.
此外,自一九九八年三月一日起,所有拖架都要每年进行检验。
4.
We've five tractors to till the land.
我们有五架拖拉机耕地。
5.
A Design of Force Testing Frame Plan for CRH2-300EMU Trailer Bogie
CRH2-300型动车组拖车转向架测力构架方案设计
6.
Base cabinet end-shelf. Drag to the side of base cabinet.
落地橱端架。拖动到落地橱的侧面。
7.
bracket stub-axle for road motor vehicles or tractors
道路机动车辆或拖拉机用短轴托架
8.
Drag onto the page to add a logical partitioning schema.
拖到绘图页后,可以添加逻辑分区架构。
9.
Strength Analysis on Trailer Frame of CRH_2;
CRH_2动车组拖车构架强度分析
10.
Development of the TZJ40(B) vertical derrick's traction-driven rig
TZJ40(B)直立井架拖挂钻机的研制
11.
Drap Erection Construction for 30 m Prestressed T Girder in Maliu Middle Bridge
麻柳中桥30m预应力T梁拖拉架设施工
12.
Base peninsula end-shelf. Drag to the side of base peninsula cabinet.
半岛式落地橱端架。拖动到半岛式落地橱的侧面。
13.
Drag onto a rack or cabinet shape to snap into place.
拖到机架或机柜形状上可立即咬定位置。
14.
The fourth aircraft was forced to land alongside a Dutch trawler.
第四架飞机在一艘荷兰拖网渔船旁迫降。
15.
Raise rear of vehicle off ground and install tow dollies under rear wheels.
将车辆后侧举离地面,在后轮下安装拖曳支架。
16.
Drag to add a 3-D elevated flyover with road segment.
通过拖动添加带有路段的三维高架立交桥。
17.
The Structure s Optimum Design on the Bogie for Tilting EMU Passenger Car;
摆式电动车组拖车转向架结构优化设计
18.
Finite Element Analysis on Rear Frame of KAT1804 Wheeled Tractor
有限元在KAT1804轮式拖拉机后车架研发中的应用