说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 增建二线
1.
The salt lake area road foundation design of the newly built second line in Xi-Ge section of Qing-Zang line
青藏线西格段增建二线盐湖路基设计
2.
Mechanized track laying in parallel with the adjacent existing railway line
既有线增建二线小间距并行地段的机械化铺轨
3.
Considerations of cost compilation in double-track railway projects and tunnel strengthening projects of existing railway
增建二线及既有线隧道加固工程的造价编制
4.
A Summary for Geological Conditions of Cuihuashan Super Long Tunnel in Supplemented 2~(nd) Line of Xi'an-Ankang Railway
西康线增建二线翠华山特长隧道地质条件综述
5.
Construction Technology of Mechanical Pavement & Bridge Erection on Electrical Double-Track Railway;
电气化铁路增建二线机械铺轨架梁施工技术
6.
On the necessity of preparing norms for double - tracking existing single track electric railways;
论编制既有电气化增建二线铁路定额的必要性
7.
An analysis of construction norms for controlled blasting of cutting stonework for the second track added to existing railway electric line;
铁路增建二线路堑石方控制爆破施工定额浅析
8.
Construction technology of rail weighbridge of Duoluokou station in of the new second line Wukang railway
武康增建二线舵落口车站轨道衡施工技术
9.
Research on Methods of Plane Computation in Reconstructing an Existing Railway Line and Expanding the Second-Line and Software Empoldered;
铁路既有线及增建二线平面计算方法的研究及软件研制
10.
Discussion on interference range of existing railway transportation to the blasting rock move;
增建二线爆破开挖石方受行车干扰范围的探讨
11.
TEST AND ANALYSIS ON CONSTRUCTION VIBRATION EFFECT OF LANZHOU-QINGHAI RAILWAY ADDITIONALLY DOUBLE-TRACKING
兰青铁路增建二线青海省乐都段施工振动效应测试与分析
12.
Experience of the Concurrent Construction to the Feeder Cable Project and the Rail Lines Reconstruction in the Newly-built Second Line and Feeder Cable Modification Construction in the Existing Electrification Railway Lines
既有线电气化铁路增建二线改造接触网与线路并行施工的几点体会
13.
Budget estimate making of double tracking project of existing electric railways--Impacts of train operation interference on engineering and estimate making;
既有电气化铁路增建二线工程概算编制——行车干扰对工程及概算编制的影响
14.
Forecast for Gushing Water and Evaluation on Hydro-geological Conditions in Guanjiao Tunnel on the Supplemented Second Line between Xining and Ge'ermu of Qinghai-Tibet Railway
青藏铁路西宁至格尔木段增建二线关角隧道涌水预测及水文地质评价
15.
Selection of the line alignment scheme of the section of the new second line in Xi-Kang railway;
西康线增建第二线某段线路走向方案选择
16.
THE ENVIRONMENTAL PROTECTION CONSIDERATION OF LINE PROGRAM SELECTION OF RECONSTRUCTING RAILWAY PROJECT FROM XIANG XIANG FAN TO AN KANG;
改建铁路沪汉蓉通道襄樊至安康段增建第二线关于环保问题的方案选线
17.
ASSESSMENT OF THREATENING ENGINEERING GEOHAZARDS ON THE SECTION BETWEEN XINING AND GOLMUD AS PART OF THE SECOND PHASE OF THE QINGHAI-TIBET RAILWAY PROJECT.
改建铁路青藏线西宁至格尔木段增建第二线工程地质灾害危险性评估
18.
The Liner Growth of 2-Dimension B-Valued Dirichlet Series;
二维B值Dirichlet级数的线性增长性