1.
Comparison of the Second Changjiang River Bridge in Wuhan with the Wuhan Changjiang River Bridge
武汉长江二桥与武汉长江大桥的比较
2.
Construction of Bored Piles in Double wall Steel Cofferdam for the Second Changjiang River Bridge in Wuhan
武汉长江二桥双壁钢围堰钻孔桩施工
3.
The Studying of Prestressed Concrete Duct Grouting Experiment For Naming Changjiang Second Bridge;
南京长江二桥预应力混凝土孔道灌浆试验研究
4.
Real Time Measurement and Analysis of Cable Force for Second Nanjing Yangtze River Bridge

运营状态下南京长江二桥拉索索力测试与分析
5.
Application of Optical Fiber Sensing Technology in Strengthening Monitoring of Wuhan Second Yangtze River Bridge
光纤传感技术在长江二桥加固监测中的应用
6.
Application of Tunnel Anchorage with Anchor Rods to Anchor System of the Second Yangtse River Bridge in Wanzhou City
隧道式锚碇加锚杆在万州长江二桥锚固系统中的应用
7.
Calculation,Analysis and Design of Combined Structure of Tunnel Type Anchorage and Rock Bore Anchor for the 2nd Wanzhou Changjiang River Bridge
万州长江二桥隧道式锚碇与钻岩锚组合结构计算分析和设计
8.
Simplicity Perfection:Configuring Design of Pylons of Erqi Changjiang River Bridge in Wuhan
简约的完美——武汉二七长江大桥桥塔造型设计
9.
Construction of Foundation of Pylon Pier No.5 of Erqi Changjiang River Bridge in Wuhan

武汉二七长江大桥5号主塔墩基础施工
10.
Engineering Characteristics and Parameter Value of Pile Foundation Design of Crushing Mudstone of Main Bridge Project of Erqi Yangtze River Bridge in Wuhan
武汉二七长江大桥正桥破碎泥岩工程特性与桩基设计参数取值
11.
Wuhan Yangtze River Bridge is the first bridge built over the River.

长江大桥是长江上修建的第一座桥。
12.
The Nanjing Yangtze River Bridge is as long as 6,700 meters.

南京长江大桥长达6,700米。
13.
The Bridge-Building Machine Construction Technology Used to Construction the Third Bridge of Yangtze River at Nanjing.;
南京长江三桥南引桥造桥机施工技术
14.
The third bridge over the Yangtze Rive has also started construction.

长江三桥也已动工。
15.
In this paper, the construction of the deck surfacing of the Bridge is presented.

介绍巴东长江公路大桥桥面铺装情况。
16.
Study on Steel Deck Pavement Technology of Yichang Large Bridge over the Yangtse River

宜昌长江大桥钢桥面铺装技术的研究
17.
Analysis of Wuhu Changjiang River Bridge Deck’s Effective Width

芜湖长江大桥桥面板的有效宽度分析
18.
Static and Moving Load Experiment of the Constructed Hanjiang Super-major Bridge in Changjing Railway
长荆铁路汉江特大桥成桥静、动载试验