1.
Design and Construction of Bored Metro Tunnels Passing Through Sand Layer

地铁矿山法隧道过砂层的设计与施工
2.
Study on Calculation Method of Mined Tunnel Reliability Regarding Beijing Subway;

北京地铁矿山法隧道结构可靠度计算方法研究
3.
Protection Design Technology for Ground Buildings above Tunnel Mining in Urban Area

城市矿山法隧道地面建筑物保护设计技术
4.
The Design and Construction of the Entrance to Subway Mined Tunnel from Deep Foundation Pit
明挖基坑内地铁矿山法隧道进洞的设计与施工
5.
Underground Excavation Construction of Metro Tunnel Based on Ground Freezing Method

基于冻结法的地铁区间隧道矿山法暗挖施工
6.
Mining method construction of the subway tunnel the control method of the land subsidence

地铁隧道矿山法施工与地面沉降控制方法
7.
Bush waterproofing system used in tunnels with mine construction

衬套防水系统在矿山法施工隧道中的应用
8.
The mine tunneling construction numerical simulation supported by pipe shed in subway tunnel
地铁隧道管棚支护下矿山法施工数值模拟
9.
Monitoring and Analysis of Surface Buildings Settlement in Subway Tunnel Using Mining and Shield Driving Methods
矿山法和盾构扩挖法施工地铁隧道地表建筑物沉降监测分析
10.
Study on the Mechanical Characteristic of the Fabricated Railway Tunnel Lining Constructed with Mining Method;
矿山法施工的铁路隧道装配式衬砌力学特性研究
11.
Research on Mechanical Characteristic of Fabricated Lining of High Speed Railway Longspan Two-Line Tunnel Constructed with Mining Method;
高速铁路大跨度双线隧道矿山法施工的装配式衬砌力学特性研究
12.
The miners tunnelled through the mountain to find coal.

矿工在山里打通隧道找煤。
13.
open a mine, well, tunnel, etc

开矿、 打井、 凿隧道
14.
Application of Multi-boom Rock Drilling jumbos in Advance Pre-grouting Hole Drilling during Construction of Mined Tunnels
多臂凿岩台车在矿山法暗挖隧道超前预注浆施工中的应用技术研究
15.
Regulation and Prevention and Cure Methods to Groundwater in Mountain Tunnel;

山岭隧道地下水规律及防治方法研究
16.
Study on Evaluation Method of Tunnel Engineer and the Apply in Qiyue-Mountain Tunnel;

隧道工程风险评估方法及其在齐岳山隧道工程中应用研究
17.
Stability analysis of Zhoushan subsea tunnel with drill-and-blast construction method

舟山灌门水道海底隧道钻爆法施工稳定性分析
18.
To dig a mine or tunnel beneath.

在下面挖矿或挖隧道