1.
Study on transportation system of long and large tunnel construction by TBM

长大隧洞掘进机施工洞内运输系统研究
2.
Development mechanism and engineering control technology for surrounding rock loose circle of deeply embedded long tunnel
深埋长大隧洞围岩松动圈发展机理分析与控制
3.
Numerical Simulatition Study on Ventilation During Fire in Double Long Highway Tunnel

双洞长大公路隧道火灾事故通风数值模拟研究
4.
The Study on Shear Creep Model of Wall Rock of Long, Great and Deep Buried Tunnel;

长大深埋隧洞围岩非定常剪切蠕变模型初探
5.
Mechanism Analysis and Prevention Study on Rock Burst of the Surrounding Rock in Long-big Diversion Tunnel;
长大引水隧洞岩爆机理分析及防治研究
6.
Study of Ventilation Organization of Double Long Road Tunnels on Fire;

双洞长大公路隧道火灾模式下的通风组织研究
7.
An Improvement on the Construction Process of Double-tracked–Single Bore Long Tunnel

新建铁路长大隧道“单洞双线轨道运输”工序改良
8.
Construction Support and Geology Forecast of Weak Rock Large-span Long-diversion Tunnel

软岩大跨度长引水隧洞施工支护与地质预报
9.
Research on Design Optimization of Construction Method in Entrance of Foling Long and Large Tunnel
佛岭长大隧道洞口段施工方案优化研究
10.
Technology of GPS Plane Control Survey outside Long Railway Tunnels

铁路长大隧道GPS洞外平面控制测量技术浅析
11.
Grouting Construction Technology of Long Hydraulic Tunnels with High Crustal Stress and Large Cross-sections
高地应力大断面特长水工隧洞灌浆施工技术
12.
Study on the Stability and Prediction of Large Deformation of the Long Large Hydraulic Tunnel in the Soft Surrounding Rock;
软岩长大引水隧洞围岩稳定性评价及大变形预测研究
13.
The Study of Tunnel Fire and Fire Protection & Succor Safety System about Long Double Tube Road Tunnel;
长大双洞公路隧道火灾及防灾救援安全体系研究
14.
Rapid and Comprehensive Construction Techniques for Great and Long Tunnel Passing Through Fractured Karst Zone Rich in Water
通过岩溶富水破碎洞段的长大隧道快速综合施工技术
15.
STUDY ON 3D PHYSICAL MODEL TEST OF SEEPAGE OF DEEP-BURIED LONG AND LARGE DIVERSION TUNNEL

深埋长大引水隧洞三维物理模型渗透性试验研究
16.
Treatment Techniques for the Main Karst Cave at the Outlet of the Changdangzi Tunnel

长凼子隧道出口主洞溶洞处理施工技术
17.
Discussion on Long Tunnel Excavation Cost in Hydraulic and Hydroelectric Project

水电工程长隧洞开挖造价问题的探讨
18.
Research on Simulation and Optimization to TBM Construction Processes for Long Complex Tunnels;
复杂长隧洞TBM施工过程仿真优化研究