1.
A Probe into the Vehicle Routing Problems with Loader Scheduling;

含装卸工调配的车辆路径问题的探讨
2.
Modeling and Optimization for Berth Allocation and Quay Crane Scheduling System;

港口泊位分配与装卸桥调度系统的建模与优化
3.
Research on Simulation Optimization of Ore Handling System and Equipment Configuration on Ore Port;
矿石码头装卸工艺系统设备配置仿真优化
4.
The stevedores'work is to load and unload ships.

(码头)装卸工人的工作是装卸船只。
5.
prefabricated or sectional building

装配式或拆卸式房屋
6.
International Cargo Handling Coordination association

国际货物装卸协调协会
7.
reversible laydays

可调剂用的装卸日期
8.
carrying forward dispatch time

可调剂使用的装卸时间
9.
taper coordinated oil-pressure dismantler

锥度配合油压拆卸工具
10.
To unload(a vehicle or container).

卸载,卸(货)(从运载工具或集装箱中)卸下(货)
11.
a burly stevedore;

一个魁梧的装卸工;
12.
lay day statement

货物装卸作业报告书(包括货物装卸、停工
13.
One that removes tops or puts tops on.

卸顶工,装顶工拆除或安装顶状物的人
14.
Uninstall and reinstall your modem

卸载并重新安装调制解调器
15.
built - up milestone

装配式磨石, 可拆卸的磨石
16.
It's easier to take a machine to pieces than to put it together again.

拆卸一部机器比重新装配起来容易。
17.
Stochastic Network Model for Disassembly of Discarded Products;

装配式产品拆卸的随机网络模型研究
18.
Cargo Handling System in Container Terminal

集装箱码头的装卸工艺方式