1.
Research & Design of Automatic Generation Control System for Cascaded Hydropower Plant;

梯级水电厂自动发电控制研究与设计
2.
Optimal operation of cascade hydropower plants in competitive electricity market;

梯级水电厂日竞价优化运行方式研究
3.
Daily optimal operation of cascaded hydropower plants under different trade mode;

不同交易方式下的梯级水电厂日优化运行
4.
Day-Ahead power generation scheduling of cascaded hydropower plants based on contract;

基于物理合同的梯级水电厂日前交易电量优化分配
5.
Study on economic operation of cascaded hydropower station under competitive price market;
竞价上网环境下梯级水电厂的经济运行问题研究
6.
Study on solving problems from in-house economical operation of cascade hydropower stations in river basin with bi-level coupling genetic algorithm
双层耦联遗传算法求解流域梯级水电站厂内经济运行问题研究
7.
cascade hydroelectric power stations on Columbia River

哥伦比亚河梯级水电站
8.
Hydraulic Transients Research of Diversion System in Cascade Hydropower Stations Connected by Open Channel;
梯级电站引水系统水力过渡过程研究
9.
Optimization of reservoirs dispatching of Huaguangtan cascade power stations

华光潭梯级水电站水库优化调度探讨
10.
Discussions on the Unified Price of Electricity Sent into Grid for Cascade Hydropower Stations;
流域梯级水电站统一上网电价的探讨
11.
Study on Optimal Scheduling Model and Algorithm of Cascaded Hydroelectric Power Plants;

梯级水电站优化调度模型与算法研究
12.
The Demonstration of Waterpower Gradual Exploitation in the Datong River Section in Gansu;
大通河甘肃省河段水电梯级开发论证
13.
The Short-term Optimal Scheduling of Hydro Power Systems with Cascaded Reservoirs;

梯级水电系统短期优化调度问题研究
14.
The bidding model of cascaded hydropower stations considering reserve service in day-ahead market;
考虑备用的梯级水电站日前竞价模型
15.
The Study and Application for Optimal Operation Chart of Cascade Reservoirs

梯级水电站群优化调度图研究及应用
16.
Discussion on the short-term weekly optimal scheduling of cascade hydropower stations

梯级水电站短期周优化调度规律探讨
17.
Aseismatic Safety Analysis of the Cascade Hydroelectric Power Stations on the Lower Jinsha River
金沙江下游梯级水电站抗震安全分析
18.
Ertan hydropower station is the first power station built on Yalong River.

二滩水电站是雅砻江梯级开发的第一个水电站。