说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 临时底孔
1.
Design and installation quality control of experimental tendon tension load cells at temporary bottom outlet for Laxiwa hydropower project
拉西瓦水电站泄洪临时底孔部位试验性锚索测力计设计及安装质量控制
2.
Analysis and treatment on pile bore checking collapse accidents of large diameter bored perfusion pile
大口径钻孔扩底灌注桩在孔形检测时的塌孔分析及处理
3.
Clinical Observation of Treatment of the Pulp Chamber Floor s Perforation of Deciduous Molar, 96 Cases Report;
治疗96例乳磨牙髓室底穿孔的临床观察
4.
clinical evaluation of perforation the milk teeth cavity treat limited
替硝唑合剂治疗乳磨牙髓底穿孔的临床分析
5.
X-ray revealed that the new methods of site-specific puncture technology for showed foramen of cranial base and the clinical value of it
X线下显示颅底卵圆孔的新方法及其临床价值
6.
Repairing pulp floor perforation with light-cured glass ionomer: clinical observation
光固化玻璃离子修复髓底穿孔临床观察
7.
tap(ping) drill
螺丝孔钻,螺丝底孔钻
8.
Clinical Summary of 1260 Patients with "Three Holes and One Hook in The End" Laparoscopic Cholecystectomy
“三孔一勾到底法”腹腔镜胆囊切除术1260例临床总结
9.
Laparoscopic antireflux surgery in treating gastroesophageal reflux disease (a report of 45 cases)
腹腔镜食管裂孔修补和胃底折叠术的临床应用(附45例报告)
10.
The research of microsurgical treatment approached from the lateral fissure keyhole for hypertensive cerebral hemorrhage in basal ganglia
锁孔外侧裂入路治疗高血压脑基底节出血的临床应用
11.
Steel Bar by a clockwise direction as to gently implanted hole parallel to the hole, JACK until the end of adhesive overflow.
按顺时针方向把钢筋平行于孔洞走向轻轻植入孔中,直至插孔底,胶粘剂溢出.
12.
Therefore, the barrier distribution should be taken into consideration for the perforation of reservoir with bottom water and gas cap.
因此,气顶底水油藏油井射孔时,应考虑隔板的分布。
13.
PROBLEMS OF DESIGN AND CONSTRUCTION OF HAND-EXCAVATED PILE EXPANDING BOTTOM IN SAND BED
人工挖孔桩在砂层上扩底时应注意的设计与施工问题
14.
Historical Co-relatedness of Confucius and Socrates in Establishment of Virtues East and West;
东西方文化的历史契合——评“轴心时代”孔子与苏格拉底的道德观
15.
Therefore, when the lifting force of gate of the bottom outlets is designed, the sediment pressure and friction force should be considered by full holes sediment.
所以在设计底孔闸门启门力时,泥沙压力及摩擦力可按满孔泥沙考虑.
16.
The government expected a temporary accord with the Opposition before the end of the year.
政府期望年底以前和反对党达成临时协议。
17.
counterbore with guide
有导柱的平底扩充孔钻
18.
embroidery ,openwork, with visible ground
透孔刺绣,有可见底布