说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工界面
1.
Technical Management of Installation and Construction Working Interface in the Beforehand Burying Phase;
安装配合土建工程施工界面的技术管理
2.
Technical Management of Interface Crossing between Installation and Civil Engineering
安装与土建工程施工界面交叉的技术管理
3.
The retarding jetting construction technology adopted in composite bridge concrete interface
复合桥面混凝土界面采用缓凝水冲施工技术
4.
Application of Interface Management of the Construction in Nanjing Olympic Center Natatorium
界面管理在南京奥体游泳馆工程施工中的应用
5.
93208# longwall face in Jinjie Coal Mine:mine water prevention and control measures and application effects
锦界煤矿93208综采工作面防治水措施和效果
6.
The Research on Interfacial Bond Behavior of RC Structure Reinforced by HPF and Construction Technology of the HPF;
HPF加固混凝土结构界面粘结性能与施工技术研究
7.
Construction operation specification for roof engineering
屋面工程施工操作规程
8.
The characteristics and treating measure of the compound road surface interface layer
复合式路面界面层的特点及处治措施
9.
Specification for construction of slurry sealing of road face
路面烯浆封层施工规程
10.
restrictive practices in industry
工业方面的限制性措施
11.
The world is entering an information era. We must adopt positive measures to encourage investment in the information industry and infrastructure, and nurture expertise in this area.
世界正进入资讯新时代,我们必须采取积极措施,鼓励资讯工业和基建的投资,培养这方面的人才。
12.
Interface Management for Transportation Infrastructure BOT Projects
交通基础设施BOT项目的界面管理
13.
Measures for Improving Cement Concrete Pavement Construction Quality
提高水泥混凝土路面施工质量的措施
14.
Specification for construction and acceptance of interlocking brick pavement
联锁型路面砖路面施工及验收规程
15.
Construction Method of Large-area Super Smoothness Concrete Ground
大面积超平整度混凝土地面施工方法
16.
Veneer Overlaying Technology and Precautionary Measures against Relevant Defects
薄木贴面工艺及贴面缺陷的预防措施
17.
all the necessary preparations for construction of the Olympic venues and facilities will be completed;
全面落实奥运场馆、设施的前期工作和施工准备;
18.
Horizontal construction joint shall be set at the top of the slab.
5施工缝留设:水平施工缝留置于板顶面。