1.
Study on Method of Construction Contract Price Adjustment under Building Materials Price Fluctuate;
建材价格波动时施工合同价格调整方法的研究
2.
Theory and Measure for Adjusting Contract Price of Hydropower Project;

水电建设项目合同价格调整的理论与方法研究
3.
Contract price adjustment system and method of Xiaolangdi Multipurpose Dam Project;

小浪底水利枢纽工程的合同价格调整体系与方法
4.
Price Discount and Adjustment in FIDIC Contract;

FIDIC合同中的价格贴现与调整
5.
Avoiding Material Price Risk According to the Terms and Conditions on Adjusting of Price in the Contracts of FIDIC;
从FIDIC合同条件中的价格调整和调价公式看建材价格风险规避
6.
Application of Price Index Method toRegulate Cost of Project Determined by Contract

价格指数法在工程合同造价调整中的应用
7.
Price Adjustment of Civil Engineering Contract for a Capital Construction Project;

试论基本建设项目土建施工合同中的价格调整
8.
Discussing into the Weighted Coefficient in Price Adjustment Equation of FIDIC Contract When the Bid Price Is Quoted with Several Kinds of Currency
浅谈fidic合同多种货币报价时价格调整公式中的权重系数
9.
Price adjustment provisions applying to the period of execution of the Contract shall not be taken into account in tender evaluation.
(五)合同执行期内适用的价格调整条款在评标中不予以考虑。
10.
price-adjusted rates of exchange

价格调整汇率(价调汇率)
11.
How to rationally adjust the construction contract price

浅谈如何合理调整工程施工合同价款
12.
Adjust Allocation Structure Rationally Achieve Common Prosperity Step by Step;

合理调整分配格局 逐步实现共同富裕
13.
Analyze the Relation between Contract Value Adjustments and Claims;

浅析施工合同价款调整与索赔的关系
14.
Application of Hedonic Quality Adjustment in Compiling Consumer Price Indices;

不同质量调整法在消费者价格指数(CPI)中的应用
15.
Research on Information Adjustment Speed of Stocks Price with Different Level of Trading Volume;
不同交易量股票价格的信息调整速度差异研究
16.
Adjustment Principle of Contract Cost Settlement in Evaluation with Bill of Quantity;

浅析工程量清单计价合同结算价款调整原则
17.
Seller reserves the right to adjust the contracted price, if prior to delivery, there is any variation in the cost of labor or raw material or component parts.
如果在交货前劳动力原材料成本或其组成部分发生任何变化,卖方有权调整合同价格。
18.
The tenderer shall complete Schedule III-Price Adjustment Provisions and shall submit with his tender such other supporting information as is required under Clause70 of the Conditions of Contract.
投标者应完成表三-价格调整条款-并按合同条款的要求与投书一起提供这样的配套文件。