1.
The deformation process curve of the Wanjiazhai dam crest exhibits many peaks.
万家寨大坝坝顶各监测点的变形过程是多峰曲线。
2.
The state has planned to invest two millions in the dam.
国家计划投资两百万元修建这个大坝。
3.
On the Structure Calculation of Buried Culvert of Datong Section,Northern Route of Shanxi Wanjiazhai YRDP
山西省万家寨引黄工程北干线大同段埋涵结构计算
4.
The Thought of the Poetical Works Shui Diao Ge Tou the Projectof Drawing Yellow River in Wan Jia Zhai;
《水调歌头·万家寨引黄工程走笔》发微
5.
Construction Supervision System During Yellow River Wanjiazhai Water Control Project;
黄河万家寨水利枢纽工程的建设监理
6.
On Planning of Regulation Reservoirs in North Main Line of YRDP
万家寨引黄北干线调节水库规划问题
7.
Numerical Simulation Analysis on Seepage Field for Wan Jia Kou Zi Arch Dam Foundation
万家口子拱坝坝基渗流场有限元数值模拟分析
8.
The Choice of High Voltage Fuse Protectors in Wanjiazhai Hydroelectric Power Plant
万家寨水电厂高压限流熔断器保护装置的选用
9.
Cavitation Behaviour Forecast of Hydraulic Turbine Runner of the Wanjiazhai Water Power Station;
万家寨水电站水轮机转轮空化性能的预测研究
10.
The Hydraulics Computer Simulation of Shanxi Wanjiazhai Yellow River Diversion project;
山西省万家寨引黄工程水力学仿真计算研究
11.
Running Analysis Research on the Hydraulic Measure System of Wanjiazhai Yellow River Diversion Project;
万家寨引黄工程水力量测系统运行分析研究
12.
Study on Quantitative Ecology Alongside Wanjiazhai Yellow River Diversion Project;
万家寨引黄工程沿线植被数量生态学研究
13.
Analysis on Constructing PCCP Factory in North Main Line Project of Wanjiazhai YRDP;
万家寨引黄工程北干线PCCP管厂的建设分析
14.
Discussing the Rubbish Repair on the First Stage Wanjiazhai Yellow River Diversion Project in Shanxi Province;
山西省万家寨引黄一期工程弃渣治理研究
15.
Water Price Design of the North Arterial Project of Yellow River Diversion in Wanjiazai;
对万家寨引黄北干线工程水价设计的思考
16.
Analysis and Probe on Water Cost Price of Stage 1 Project of Wanjiazhai YRDP;
万家寨引黄一期工程成本水价分析及探讨
17.
A Brief Talk on the Comprehensive Benefits and the Influence of Wanjiazhai Waterpower Pivot;
浅谈万家寨水利枢纽的综合效益及其影响
18.
The Water Price Analysis of Water Supply from The South Main Line of YRDP to Jinzhong Plain Region;
万家寨引黄南干线向晋中平川区供水水价分析