说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 江垭
1.
Variable economical factors in construction of Jiangya dam;
江垭大坝工程施工中变化的经济要素
2.
Jiangya underground powerhouse has 33 chambers in different size.
江垭电站地下厂房洞室群共有大小洞室33个。
3.
Monitoring and analysis of surrounding rock mass of underground powerhouse chambers of Jiangya Power Station
江垭电站地下厂房洞室围岩监测与分析
4.
Discussions on Several Problems of Construction and Design of Jiangya RCC Dam;
江垭碾压砼坝设计与施工中若干问题的探讨
5.
Optimization of the Jiangya Inhabitant Resettlement based on the Fuzzy Theory;
基于模糊理论的江垭水库移民安置区模式优选
6.
The Re-exploitation Stragegies of Tourism Products for Jiangya Hot Spring Holiday Village;
江垭温泉度假村旅游产品再开发策略分析
7.
Difficult operating status of flood control type waterpower plants and its countermeasures;
防洪型水力发电企业的经营困境及对策——以江垭水电站为例
8.
The Study on the Business Environment and Principal-agent of Zhanjiajie Jiangya Hot Spring Resort
张家界江垭温泉度假村经营环境与委托代理研究
9.
Hunan jiangya Dam undertaken by Bureau of Water Conservancy and Hydroelectric Power Construction of Liaoning Province is one of the national priority projects of China during the Nineth Five-year Plan.
由辽宁省水利水电工程局承建的湖南江垭水库,是我国九.五期间重点工程。
10.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究
11.
Failure Mechanism of Muzhuping Landslide in Shuibuya Reservoir Area,Qingjiang River
清江水布垭库岸木竹坪滑坡失稳探讨
12.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
13.
Earthwork Design for Cubic Meter of Earth and Stone in Qingjiang Rockfill Dam Construction;
清江水布垭面板堆石坝动态土石方平衡设计
14.
Closed-type Management & Vehicle Auto-distinguishing System at Construction Site of Shuibuya Hydro-project;
清江水布垭工区封闭管理和车辆自动识别系统
15.
STUDIES ON ENVIRONMENTAL CAPACITY OF THE SETTLEMENT AREA IN THE REGION OF SHUIBUYA RESERVOIR ON THE QINGJIANG RIVER;
清江水布垭水库农村移民安置区环境容量研究
16.
Analyzing stator windings main protection of generator for Qingjiang Shuibuya hydropower station
清江水布垭电站发电机定子绕组主保护分析
17.
Regulation quality parameter test technology of 460MW unit in Shuibuya Hydropower Station
清江水布垭电站460MW机组调节品质参数测试技术
18.
The PLC Controlling of the 500 kV Main Transformer Wind Cooling System in Shuibuya Hydropower Station in Qingjiang
清江水布垭电站500kV主变风冷系统PLC控制