1.
Interview with Mr. Lu Youmei:Yangtze Power & Its IPO;
长江电力 演绎清洁能源资本新篇——中国长江电力股份有限公司董事长陆佑楣访谈
2.
Study on the Overall Budget Management in China YangzeRiver Power Co.,Ltd;
中国长江电力股份公司全面预算管理研究
3.
Study on Strategic Cost Management of China Yangtze Power Co., Ltd;
中国长江电力股份公司战略成本管理研究
4.
Study and Implement on the Enterprise Information Integrated System of China Yangtze Power Co,.Ltd.;
长江电力企业信息集成系统的研究与实现
5.
Far-reaching influence of the reorganization of China Yangtze Three Gorges Project Development Corporation into a listed company;
长江电力股份公司改制上市的深远影响
6.
Designing the e-Commerce Solution of China Yangtze Power Co,Ltd;
中国长江电力股份有限公司电子商务的方案设计
7.
Research and Application of Stator Bar with Elongation of 360°Transposition in Xinanjiang Hydropower station Hydrogenerators
新安江水力发电厂发电机定子线棒延长360°换位方式的研制和应用
8.
An Economic Analysis of Alternative Policies for Controlling SO_2 Emissions in the Yangtze River Delta s Electric Generating Sector;
中国长江三角洲地区电力行业SO_2排放控制的经济分析
9.
Application of Multi-factor SVM Method in Power Load′s Medium and Long Term Forecasting for Jiangsu Province
多因素支持向量机模型在江苏省中长期电力负荷预测中的应用
10.
Changjiang River:Its Life,Waterways,and Productive Forces;
增强长江健康生命 保护长江黄金水道 发展长江经济带生产力
11.
Research on Single-vessel Passing Capacity in Yingongzhou Channel, Yangtaz River;
长江镇江段尹公洲航段单船通过能力研究
12.
The Comparison between Changjiang Delta and Pearl River Delta are Aeconomics Competition;
长江三角洲与珠江三角洲经济竞争力的比较
13.
The Study on Channel Capacity at the Yangtze River in Jiangsu and Ship Model Standardization
长江江苏段通过能力及船型标准化研究
14.
Fatigue Stress Monitoring and Fatigue Life Analysis of Steel Box Girder of Jiangyin Suspension Bridge
江阴长江大桥钢箱梁疲劳应力监测及寿命分析
15.
The Study on the Wind-powered Electricity Development Strategy of the Electricity Company in Heilongjiang;
黑龙江省电力公司风电发展战略研究
16.
Test of power system stabilizer for Heilongjiang power grid
黑龙江电网电力系统稳定器(PSS)的试验
17.
Fulfilling Scientific Development View to Advance the Kernel Competitive Power of Enterprise──Gather News from Mr.LIU Mingjiang,the Director of Sinohydro Engineering Bureau 7;
落实科学发展观 提升企业核心竞争力——中国水电七局局长刘明江访谈录
18.
It guaranteed the closure of the dam across the Yangtze River.
从而有力地确保了长江截流的成功。