说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 立交隧道
1.
Study on the Scheme Optimization of Underground Interchange Tunnel;
地下互通立交隧道上下层主隧道施工方案优化研究
2.
Study on the Construction Mechanics and Scheme Optimization of Underground Interchange Tunnel;
互通式地下立交隧道施工力学研究及方案优化
3.
Acoustic emission monitoring of surrounding rock of overpass tunnels with small clear spacing
小净距立交隧道开挖围岩稳定性声发射监测
4.
Study on Bifurcating Form and Mechanical Behaviors of Underground Interchange Tunnel
互通式地下立交隧道分岔形式和施工力学行为研究
5.
Study on Soletanche Grouting Technology Used in a Metro Tunnel Under Crossing an Overpass
下穿立交桥地铁隧道袖阀管加固技术研究
6.
Analysis of Dynamic Response of Close Crisscross and Overlapping Tunnel Subjected to Moving Train Load
列车荷载作用下立体交叉隧道结构动力响应分析
7.
Comparative study on the femoral tunnel creation in anatomic double-bundle anterior cruciate ligament reconstruction
前交叉韧带解剖双束重建中股骨隧道建立路径的比较研究
8.
Infiuence of Different Approximities of Overiapped Tunneis on Rock Pressure and Lining Mechanical Behavior
立体交叉隧道不同近接距离对围岩压力和衬砌结构力学行为的影响
9.
Inter-District Working Group on Lion Rock Tunnel Traffic Problems
狮子山隧道交通问题区域工作小组
10.
Research and Design of Tunnel-switching Technology in VPN;
VPN中隧道交换技术的研究与设计
11.
The Research and Realization of Tunnel-switching Technology Based on IPsec;
IPsec隧道交换技术研究与实现
12.
Study on the Influence Zone of Adjacent Construction of over Crossing Tunnels;
上下交叉隧道近接施工影响分区研究
13.
An Empirical Study on Related Party Transactions and Expropriation of Controlling Shareholders;
关联交易与控制性股东的“隧道行为”
14.
Probe into Traffic Safety Problems in Tunnels of Expressways in Mountainous Area
山区高速公路隧道交通安全问题探讨
15.
Installation of 220 kV XLPE Cables in a Tunnel
220kV交联聚乙烯高压电缆隧道敷设工程
16.
Name used by the tunnel initiator during the authentication phase of tunnel establishment
在隧道建立的身份验证阶段,隧道初始化程序使用的名称
17.
Dynamic response of high and low cross tunneling blasting to the existing adjacent tunnel
上下交叉隧道掘进爆破对既有隧道的动力响应研究
18.
Study on Structural Safety of Independent Exhaust Channel of Super-long Highway Tunnel in High Temperature
特长公路隧道独立排烟道结构高温安全性研究