说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大型地下洞室群施工
1.
Research on System Simulation Theory and Application for Construction Processes of Large-Scale Underground Structure Group;
大型地下洞室群施工系统仿真理论与应用研究
2.
Real-Time Control for Construction Scheduling of Large Scale Underground Structure Group;
大型地下洞室群施工进度实时控制研究
3.
Construction Optimization of Large Underground Chamber Group and Research of Surrounding Rock Stability;
大型地下洞室群施工方案优化及围岩稳定性研究
4.
Research on Ventilation for Large Scale Underground Cavity Groups Construction;
大型地下工程洞室群施工期通风研究
5.
The Option of Excavation Sequence of Large-sized Underground Cavern and the Research of Construction Technique of Underground Factory;
大型地下洞室群开挖顺序选择及地下厂房施工技术研究
6.
Construction control for engineering geologic body of underground power house chambers
地下厂房洞室群工程地质体施工控制
7.
Study on Work Behavior of Large Scale Underground Caverns of Hydroelectric Project;
大型水电工程地下洞室群工作性态研究
8.
Engineering Geological Study on the Stability of Rock Mass Surrounding Large Scale Underground Caverns;
大型地下洞室群围岩稳定性工程地质研究
9.
Construction Numerical Simulation of Cavern Group in Underground Hydropower House;
水电站地下厂房洞室群施工数值仿真
10.
Study on the Construction Characteristic of Underground Carvens Group for Goupitan Hydropower Station;
构皮滩电站地下洞室群施工特性研究
11.
The Reliability Analysis of the Big Underground Cavities in the Construction;
大型地下洞室施工过程中的可靠性分析
12.
Numerical Simulation Analysis of the Excavation Process of Dagangshan Underground Carven Group
大岗山水电站地下洞室群施工过程数值模拟分析
13.
Artificial simulation of nonstationary artificial seismic motion for large-scale underground cavern group located in alpine gorge area
高山峡谷地区大型地下洞室群非平稳人工地震动拟合
14.
Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;
糯扎渡水电站地下厂房洞室群施工顺序研究
15.
Monitoring at Construction Period and Dynamic Reinforcement of Underground Power House Group;
地下洞室群施工期监测与动态支护设计研究
16.
Feedback Analysis Based on Monitoring of the Caverns Excavation of Underground Hydropower Plants
水电站地下厂房洞室群施工监测反馈分析
17.
Three Dimensional Numerical Simulation Analysis on Underground Powerhouse Complex Construction
地下厂房洞室群施工过程的三维数值模拟分析
18.
Study on the Stability Risk Assessment System of Large-Scale Underground Caverns Group and Application;
大型地下洞室群工程稳定性风险评估系统及其应用研究