说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 京沪铁路线
1.
Jinan is at the junction of the Beijing-Shanghai and the Qingdao-Jinan railways.
济南位于京沪铁路线和青济线的交汇处。
2.
EFFECT ANALYSIS OF JING-HU HIGH-SPEED RAILWAY ON REGIONAL ECONOMIC DEVELOPMENT;
京沪高速铁路对沿线经济发展的影响分析
3.
And Jinghu railway, Huning speedway, Jinghang canal are all near at hand.
京沪铁路、沪宁高速公路、京杭大运河都近在咫尺。
4.
Study on the Curve Radius Standards for the Divergent and Main Lines in and Adjoining Stations on High-speed Railway
京沪高速铁路车站内及站外两端的正线曲线半径标准的研究
5.
Beijing-Shanghai High Speed Railway:A Correct Strategy Choice
修建京沪高速铁路是正确的战略抉择
6.
Field Experiment on Waste Drilling Fluid Treatment of Beijing Shanghai High Speed Railway
京沪高速铁路废弃泥浆处理现场试验
7.
Erection construction technology of the 46m beam channel spanning Jing-Hu railway
46m槽型梁跨京沪铁路架设施工技术
8.
Winter Construction Technology at Guangyang Beam Fabricating Yard in Beijing-Shanghai High-speed Railway
京沪高速铁路广阳梁场冬期施工技术
9.
On the construction technology of the erection of the double line box girder along the Beijing-Shanghai railway express
京沪高铁双线整孔箱梁架设施工技术
10.
north--south rail corridor [Jing--Jiu Line]
南北铁路干线〔京九铁路〕
11.
Green Corridor Research for Beijing-Shanghai High Speed Railway of Section Beijing-jinan;
京沪高速铁路北京至济南段绿色通道的研究
12.
The Influence of Surface Subsidence on Construction of JingHu High-speed Railway (Beijing-Ji'nan) and Its Analysis
地面沉降对京沪高速铁路(北京—济南段)影响分析
13.
A Summary of Water Related Studies of the Nanjing Bridge in the Beijing-Shanghai Railway Line
京沪高速铁路南京越江大桥工程涉水研究
14.
The Qinghai-Tibet Railway, Beijing-Shanghai express railway and cross-border railways in northwest and southwest China will be constructed.
建设青藏铁路、京沪高速铁路和西北、西南进出境铁路。
15.
Our company near Beijing-Shanghai Railway, ancient Beijing-Hangzhou River, national way, Shanghai-Nanjing Expressway.
紧靠京沪铁路、行古运河、12国道、宁高速公路。
16.
Study on the Design of Main Bridge of Ji-nan Huanghe Bridge on Jinghu High Speed Railway;
京沪高速铁路济南黄河桥主桥设计研究
17.
The Substructure Construction Techniques of Jinan Yellow River Bridge on Beijing-Shanghai High-Speed Railway;
京沪高速铁路济南黄河大桥下部结构施工技术
18.
Impacts of uncertain factors on total time of construction for Beijing-Shanghai high speed railway;
不确定因素对京沪高速铁路建设总工期的影响