1.
Elaborate Arrangement and Scientific Planning to Make it Smooth the Antecedent Work of Hydropower Development Project during the Period of Tenth Five-Year Plan;
“十五”期间水电前期工作取得重要成就
2.
Study on the reform for antecedent fund raising and its management of hydropower projects

改革水电前期工作经费筹措及管理办法的研究
3.
Discussion on problems existing in early-stage work of water and hydropower project

浅议水利水电工程前期工作中存在的几个问题
4.
No efforts will be spared to complete the preparatory work for the south-to-north water diversion project, in order to start the project as quickly as possible.
抓紧“南水北调”的前期工作,力争早日开工建设。
5.
Some issues of early-stage work for Dateng Gorge Hydraulic Complex

关于大藤峡水利枢纽工程前期工作的几点思考
6.
On the Preparatory Work Experience of Power Engineering;

浅谈做好电力工程前期工作的几点体会
7.
Meanwhile, efforts will be stepped up to complete the preparatory work for the project to divert the water in the south to the north and begin the construction of the project as quickly as possible during the 10th Five-Year Plan period.
同时,加紧南水北调工程的前期工作,力争“十五”期间尽早开工建设。
8.
Suggestions for the Preparation of World Bank Loaned Highway and Waterway Projects;

公路水运世行贷款项目前期工作实施建议
9.
Management on Initial Design of Tingzikou Water Control Project

亭子口水利枢纽前期设计工作管理综述
10.
Please cable the date of your arrival, enabling us to make the necessary preparations.

希电告到达日期,以便我们事前做好准备工作。
11.
Discussion on Issues Related to the Approval and Preliminary Work of Power Grid Projects;

电网项目核准及前期工作有关问题的探讨
12.
Electronic Transfer of the Preliminary Work Results Based on Helava Technology

基于海拉瓦技术的前期工作成果电子移交
13.
Innovation on Power Grid Construction Project Management at Preliminary Stage in Anhui Province
安徽电网建设项目前期管理工作的创新与效益
14.
Difficult circumstances about marketing of mid-small enterprises in transitional period & relevant counter measures;
过渡时期中小水电厂营销工作的困境及对策
15.
Information System Development of Achievement for the Middle Route South-to-North Water Transfer Project
南水北调中线工程前期工作成果信息系统技术开发
16.
Strengthen Preliminary Work,Break through Key Technologies,Continuously Raise up The Level and Effectiveness of the Oil Gas Field Surface Engineering;
加强前期工作 突破关键技术 不断提高油气田地面工程水平和效益
17.
The first-phase preparations have been finished.

前期准备工作已经完成。
18.
Preparatory Work Discussion on Power Grid Construction Project Based on Target Management & Reconstruction Project Theory
基于目标管理、再造工程理论的电网建设项目前期工作探讨