1.
Application of the prestressed anchorage technology to the Shuikou project

预应力锚固技术在水口水电站工程中的应用
2.
Crack treatment on concrete arch dam of Xiakou Hydropower Station

峡口水电站工程混凝土拱坝裂缝处理
3.
Safety monitoring on high slope of on-site road of Shuangjiangkou Hydropower Project

双江口水电站工程场内道路高边坡安全监测
4.
Test Study on Flow Conditions at Water Intake of Power Station at Shihutang Navigation-power Junction
石虎塘航电枢纽工程电站取水口水流条件试验研究
5.
Rock Deformation and Stability Assessment of the Intake on the Left Bank for Xiluodu Hydroelectric;
溪洛渡水电站左岸进水口工程岩体变形及稳定性评价
6.
The Power Intake Structure Optimization Test for the Expansion Works of the Heping Hydropower Plant in Ya'an City
雅安市河坪水电站扩机工程取水口结构优化试验
7.
DEFORMATION-FRACTURE MECHANISM ANALYSIS AND STABILITY EVALUATION OF HIGH SLOPE FOR WATER-INTAKE OF XIAOWAN HYDROPOWER STATION
小湾水电站进水口高边坡变形机理分析及工程意义
8.
This is a diversion power station of high flood peak.

该工程为高水头迳流引水式电站。
9.
Research on Soil and Water Conservation Monitoring of Hydropower Project in Sichuan Province;
四川省水电站工程水土保持监测研究
10.
The Design on the Conservation for Water and Soil at Dingqu River Zhengdou Hydropower Station Engineering Project
定曲河正斗水电站工程水土保持设计
11.
Surface Water Environmental Impact Assessment and Analysis of Hydropower Project of Luding Hydropower Station;
泸定水电站水电工程地表水环境影响评价分析
12.
Supervision on the Underground Project and Lower Reservoir of Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站地下工程及下水库工程监理
13.
ENGINEERING GEOLOGY ANALYSIS OF COLLUVIAL SLOPE AT HYDROPOWER STATION PROJECT IN GUSHUI

古水水电站工程区域堆积体边坡工程地质分析
14.
Construction of impervious wall in CFRD of Laodukou Hydropower Station

老渡口水电站面板堆石坝防渗墙施工
15.
ENGINEERING ANALYSIS OF THE GROUNDWATER DIVERSION TUNNEL OF DANBA HYDROPOWER STATION

丹巴水电站引水隧洞地下水工程效应分析
16.
Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station
二滩水电站水垫塘6.3/0.4kV排水工程设计综述
17.
Analysis of Engineeing Quality Damage of Main Dam Foundation Concrete in Dashankou Hydropower Station
大山口水电站大坝基础混凝土工程质量事故分析
18.
Engineering Geological Research of Weathered Rocks of Hongkou Hydropower Station Dam Site and the Reasonable Optimization of Dam Foundation Surface;
洪口水电站坝址区风化岩体工程地质研究及建基面的合理优化