1.
Calculation and Application of the Mixed Weir of Small Reservoir Spillway
小型水库溢洪道混合堰的计算与应用
2.
Study on the Proposal of the Third Stage RCC Arch Cofferdam for Three Gorges Project;
三峡三期碾压混凝土拱围堰方案研究
3.
Analysis of Stress-Strain and Stability for Longitudinal RCC Cofferdam Foundation in Liuku Hydropower Station;
六库水电站纵向碾压混凝土围堰堰基应力应变及稳定性分析
4.
The Random Stability Analysis of the Downstream Concrete Slope Protection of Overflow Earth-rock Cofferdam;
过水土石围堰下游混凝土护板随机稳定性研究
5.
Construction of Cofferdam of Concrete Pouring Jacket of Pier Base of Qingdao Sea Bay Bridge in the Sea
青岛海湾大桥海中承台混凝土套箱围堰施工
6.
Temperature Control of Longitudinal Cofferdam RCC in Tingzikou Water Control Project
亭子口水利枢纽纵向围堰碾压混凝土温度控制
7.
Xiluodu Hydropower Station Cofferdam Placstic Concrete Cutoff Wall Construction
溪洛渡水电站围堰塑性混凝土防渗墙施工
8.
The Application of Pile-membrane Cofferdam on Bei Yunhe Synthesized Alteration Engineering;
桩膜复合围堰在北运河综合治理工程中的应用
9.
Application of composite geomembrane in Xiangjiaba earth-rock fill cofferdam
复合土工膜在向家坝围堰工程中的应用
10.
Fluvial Process Influenced by Earthquake Lakes and Restoration of Mountain Rivers
地震堰塞湖对山区河流的影响与综合治理
11.
Layout and storage-routing method of the weir-gateway combination of the spillway
溢洪道闸堰结合的布置与洪水调节方法
12.
Occludent Pile Cofferdam Formed by Impact Drill Applied in the Construction of Deep Water Foundation in Bridge
冲击咬合桩围堰在桥梁深水基础施工中的应用
13.
Method of High-pressure Jet Grouting Combined with Concrete Cutoff Wall and Its Application in Seepage Control of Cofferdams
围堰防渗采用高喷灌浆与砼防渗墙结合法
14.
Construction of the pouring type asphalt concrete core in upperstream cofferdam of Qia-Fu-Qi-Hai Hydraulic Project
恰甫其海水利枢纽上游围堰浇筑式沥青混凝土心墙施工
15.
Plastic Concrete Construction and Quality Control for Cofferdam Diaphragm Wall at Jinping II Hydropower Station
锦屏二级水电站围堰塑性混凝土防渗墙施工与质量控制
16.
Hydration Heat Calculation of Fly Ash in RCC for 3rd Phase Cofferdam of Three Gorges Project
三峡三期围堰碾压混凝土中粉煤灰水化热计算研究
17.
Construction Techniques for Concrete Boxed Cofferdams of Pile Caps of Non-Navigable Bridge of Qingdao Bay Bridge
青岛海湾大桥非通航孔桥承台混凝土吊箱围堰施工技术
18.
Design of Integral Steel Suspend Box Cofferdam of Base Slab for High Peg and Mass Concrete Construction Technology
高桩承台整体式钢吊箱围堰设计与大体积混凝土施工