1.
Selection of Upper Step Wedge and Pass-line Adjustment Liner
上阶梯垫和下轧制线调整垫板的选择
2.
This paper presents the application of speed and tension control system in the line of universal mill of Anshan Rolling Steel Plant.
本文介绍了速度及张力控制系统在鞍山市轧钢厂万能轧机轧制线上的应用。
3.
Optimization of the Hot Rolling Process for Narrow Strip Steel
热轧窄带钢生产线轧制工艺改造综述
4.
The practice of splitting rolling of continuous bar rolling line
全连续小型棒材轧机生产线切分轧制实践
5.
Study on the influence law of the rolling curve affected by rolling radius during cam shaft cross wedge rolling
楔横轧凸轮轴轧制半径对辊形曲线影响的规律
6.
Effect of Workpiece Torsion on Rolling Stableness during High-speed Wire Rod Rolling
轧件扭转对高速线材轧制稳定性的影响
7.
Reduction Pass Rolling in TM Finishing Mill Train of Laiwu Steel's Large H-beam Product Line
莱钢大H型钢生产线TM精轧机组减道次轧制
8.
⑤roll deformation is increasing linearly when rolling force is increasing. If the rolling force is equal, the roll deformation is invariant.
⑤随着轧制力增加 ,轧辊变形量线性增加·只要轧制力相等 ,轧辊变形基本不变
9.
The simulation result shows that the effect by the feeding angle and toe angle on the distribution of cross-rolling characteristic values along the rolling centre line in cross-rolling operation is following a certain law.
模拟结果表明,斜轧送进角和辗轧角对沿轧制中心线斜轧特征值分布形态的影响有一定的规律。
10.
Development of the PP spunlaid and thermal-bonded line with a width of 5.1 meters
幅宽5.1米丙纶纺粘热轧生产线的研制
11.
INNOVATION AND APPLICATION OF THREE-STRAND CUTTING BAR ROLLING TECHNIQUE
棒材三线切分轧制技术的创新与应用
12.
Computer simulation for rolling processes of bar,wire and shape steel
棒、线、型材轧制过程的计算机模拟仿真
13.
Numerical Simulation of GCr15 Wire and Rod Rolling Process;
GCr15棒线材轧制过程的数值模拟
14.
Research and Development of Wire Rolling Schedule Optimization Design System
线材轧制规程优化系统的研究与开发
15.
Optimisation of the Crop Shear in 1580mm Hot Strip Mill
优化剪切控制在1580mm热轧线的实现
16.
Analysis on Automatic Control System of TISC High Speed Wire Mill
天钢高速线材轧机自动控制系统分析
17.
MaSteel High-peed Wire Rod Rolling Mill Automation Control System
马钢公司高速线材连轧机自动化控制
18.
Online Arithmetic by Fast Finite Element in Strip Rolling
板材轧制过程中快速有限元在线算法