1.
					
							Possibility of Roller Compacted Concrete Rolling Construction with Layer Thickness of 50cm;
						
						
						浅谈碾压混凝土按层厚50厘米碾压施工的可行性
					2.
					
							Code for construction of hydraulic roller compacted concrete
						
					
					
						
						
					
					
						水工碾压混凝土施工规范
					3.
					
							The Research of Construction Techniques of Rccd in the High Altitude and Cold Zone;
						
					
					
						
						
					
					
						高寒地区碾压混凝土坝施工工艺研究
					4.
					
							Study on Concreting Sequence Methods about RCC Gravity Dam Construction
						
					
					
						
						
					
					
						碾压混凝土坝施工分仓跳仓方法研究
					5.
					
							Discussion on construction technique for roller asphalt concrete core
						
					
					
						
						
					
					
						碾压式沥青混凝土心墙施工技术探讨
					6.
					
							Research on the Simulation of RCC Dam Construction Process;
						
					
					
						
						
					
					
						碾压混凝土重力坝施工过程仿真研究
					7.
					
							Research and Develop of Multifunctional Machine for RCC Construction;
						
					
					
						
						
					
					
						碾压混凝土仓面施工的多功能机研制
					8.
					
							Key technology research on the rolling lean concrete base construction
						
					
					
						
						
					
					
						碾压贫混凝土基层施工关键技术研究
					9.
					
							Method of Real Time Supervisory Control Filling and Rolling Quality Construction in the Dam by GPS
						
						
						GPS大坝施工碾压质量实时监控方法
					10.
					
							Some Temperature Control Measures during the Construction of Gravity Dam for Guangzhao Hydropower Station
						
						
						光照水电站碾压混凝土坝施工期温度控制措施
					11.
					
							Guide for design of construction planning of rolled earth-rock dam for hydropower and water conservancy project
						
						
						水电水利工程碾压式土石坝施工组织设计导则
					12.
					
							Application of Roiled Concrete for Construction or Tong-Jiezi No.1 Dam
						
					
					
						
						
					
					
						碾压混凝土在铜街子工程1号坝施工中的应用
					13.
					
							Study and Application of Construction Quality Control to Hydraulic Roller Compacted Concrete;
						
						
						水工碾压混凝土施工质量控制研究与实践
					14.
					
							Equipment Choice and Rolling Craft of Roller Type Lean Concrete Base
						
					
					
						
						
					
					
						碾压式贫混凝土基层碾压设备选型及碾压工艺
					15.
					
							Research on the rapid construction scheme for the Longtan high RCC dam
						
					
					
						
						
					
					
						龙滩高碾压混凝土坝快速施工方案研究
					16.
					
							The Design and Construction of RCC Dam in Tianshengqiao-Ⅱ Hydropower Station
						
					
					
						
						
					
					
						天生桥二级水电站碾压混凝土坝的设计与施工
					17.
					
							Study on construction schemes of Three Gorges RCC dam
						
					
					
						
						
					
					
						三峡大坝采用碾压混凝土的施工方案初步研究
					18.
					
							Study on the Key Technical Issues in Construction of High RCC dam of Longtan Project
						
					
					
						
						
					
					
						龙滩高碾压混凝土坝施工关键技术研究